Agenda - 01-23-2018 8-i - Construction Bid Award for Passmore Center Expansion
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 01-23-2018
>
Agenda - 01-23-2018 8-i - Construction Bid Award for Passmore Center Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 10:58:48 AM
Creation date
1/22/2018 8:40:00 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-i
Document Relationships
Agenda - 01-23-2018 - Regular Meeting Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 01-23-2018
Minutes 01-23-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 50 <br />ARTICLE 21. FINAL PAYMENT <br />21.1 If the Work of the Contractor is limited to demolition, pilings, caissons and /or structural <br />steel, the remaining unpaid balance of the Contractor's Contract Price, less a sum equal to five. <br />tenths percent (0.5 %) of the Contract Price, shall be paid within sixty days following receipt of <br />the following documents, all of which must be received before payment shall become due: (i) <br />request for payment from the Contractor; (ii) receipt of consent from the Contractor's surety to <br />the payment; and (iii) approval or certification from the Designer that the work performed by the <br />Contractor is acceptable and in accordance with the Contract Documents. <br />21.2 Except as set forth in paragraph 21.1, within forty five days after Substantial Completion of <br />the Project, the remaining unpaid balance of the Contract Price shall be paid to the Contractor, <br />less an amount equal to two and one -half times the value of punch list work or other work <br />remaining to be completed or corrected, as reasonably estimated by the Owner. <br />21.3 Upon Substantial Completion, the Designer shall prepare and submit to the Contractor a <br />deficiency list identifying all portions of the Work which are known by the Designer at that time <br />to be incomplete or defective. Within thirty (30) days of receipt of this deficiency list, the <br />Contractor shall complete and correct all items on that list along with all other Work required to <br />achieve Final Completion of the Work. At any time prior to completion of the period of warranty, <br />the Designer may submit to the Contractor a supplemental deficiency list, in which case the <br />Contractor shall complete or correct any and all new items identified on the supplemental <br />deficiency list within the time period stipulated in paragraph 18.3. <br />21.4 Final Payment of any remaining balance of the Contract Price shall not be due to the <br />Contractor until the Contractor achieves Final Completion of the Project. <br />21.5 The making and acceptance of Final Payment shall constitute a waiver of all claims by the <br />Owner except: <br />a) Claims arising from unsettled liens or claims against the Contractor. <br />b) Defective Work or materials appearing after Final Payment. <br />c) Failure of the Contractor to perform the Work in accordance with the Contract Documents. <br />d) As conditioned in the Performance Bond. <br />e) Claims made prior to Final Payment which remain unsettled. <br />f) Amounts due arising under Articles 18 and 28. <br />g) Claims for recovery of overpayment based upon incorrect measurement, estimate, or <br />certificate. <br />21.6 The making and acceptance of Final Payment shall constitute a waiver of all claims by the <br />Contractor except those claims previously made in writing pursuant to paragraph 15.2 and <br />not finally resolved. <br />Revised 10117 <br />