Orange County NC Website
9 <br />Name: Mr, And Mrs. Grasty Page 6 of 15 <br />Address: 119 Hayes Street <br />City: Hillsborough <br />Phone #: 732-3608 <br />Date: <br />S <br />D. PLI_INIBING <br />1, Remove existing galvanized plumbing vent and drain line from exterior <br />rear wall to bottom of Kitchen sink and extending under house to main <br />drain hub under house. Remove existing galvanized/cast iron drain line <br />from main drain hub to underground connection at front of crawlspace. <br />Supply and install new plastic drain line to relocate Kitchen drain to inside <br />of sink base cabinet, including a "Studer" vent. Includes supply and <br />install new drain line to new washing machine box in laundry closet.. <br />Other new drain lines to be at same locations, including proper tiean to <br />existing remaining line, complete. Restore vent and drain lines to proper <br />worlting order. Work shall be performed in an efficient, worlananlike <br />manner so as to keep "down time" and temporary connections to a <br />minimum.. All work to code. <br /> <br />2, Supply and install insulating material to existing accessible water supply <br />lines in crawlspace, complete, <br />3. Disconnect existing laundry hot and cold water supply lines in sub-azea <br />immediately under laundry closet. Supply and install new washing <br />machine box in wall immediately behind washing machine. Make proper <br />connection to existing water lines in sub-area and supply and install new <br />hot and cold water supply lines inside of existing wall behind washing <br />machine and connect to new washing machine box, complete. All work to <br />code. <br />E. ELECTRICAL <br />h.. Properly disconnect and abandon existing electrical service. Supply and <br />install new 2Q0 AMP electrical service to house including new breaker <br />panel, mast, weatherhead, grounding and bonding, complete. Work shall <br />be performed in an efficient, workmanlike manner so as to keep "down <br />time" and temporary connections to a minimum. Includes locating <br />electrical meter a minimum of 31.f away from existing gas meter and as <br />close as practical to existing location. Includes new circuits, breakers, <br />grounding and bonding, complete. Breaker panel to be at existing location <br />with circuits and breakers to be clearly identified. Newly installed <br />