Browse
Search
Agenda - 08-22-2006-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:29:49 PM
Creation date
8/29/2008 9:39:52 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />Name: Mr. And Mrs. Grasty <br />Address: 119 Hayes Street <br />City; Hillsborough <br />Phone #: 732-3608 <br />Date: <br />Page 5 of 15 <br />10. Trim exposed subfloor to be even with outer face of existing trim above <br />on front exterior wall of storage room. Supply and install one new <br />trim/band board of treated material extending from top of existing trim <br />board to bottom of existing framing, Top edge to have 15 degree slope <br />down and away from wall. End and wall joints to be caulleed and sealed <br />with clear latex silicone paintable caullcing. New materials to match <br />existing as close as practical.. <br />11. Excavate under left front corner of storage room to accommodate <br />installation of new 18" x 18" x 12"deep concrete footing and brick <br />column. Supply and install new concrete footing and 12" x 12" brick and <br />mortar column to provide additional support for existing framing at this <br />location. Includes mortar between top brick and bottom of existing <br />framing. <br /> <br />12, Remove existing temporary barrier in front of right side wall foundation <br />vent and remove existing foundation vent, Supply and install new <br />operable foundation vent to restore to proper working order. New <br />materials to match existing as close as practical. <br />C. ROOF & GUTTER <br />1. Remove all existing gutters from house, porch and patio. NOTE: After <br />gutters axe removed, if further damage is discovered the Owner, <br />Contractor and Rehabilitation Specialist will meet to review the work, <br />determine a course of action and, if necessary, a cost for any additional <br />work. Plumb-cut existing rafter tails on reaz edge of rear patio for plumb <br />installation of new fascia board. Supply and install new 2x treated wood <br />fascia, Supply and install new pre-finished metal flashing on fascia on <br />front of house and front porch, on fascia on reaz of house, on fascia on <br />storage room and rear patio fascia. New flashing to extend from under <br />existing roof cover to inside of new gutter to provide moishue protection <br />for fascia material. Supply and install new pre-finished seamless Ogee <br />style gutters on front of house and front porch, on rear of house to extend <br />24" over each side of rear patio roof, on rear patio, and on storage room <br />with at least one downspout for each gutter and one downspout for every <br />30' of gutter.. Each grade level downspout shall tie in to french drain <br />system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.