Browse
Search
Agenda - 08-22-2006-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:29:49 PM
Creation date
8/29/2008 9:39:52 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Name: Mr. And Mrs. Grasty <br />Address: 119 Nayes Street <br />City: Hillsborough <br />Phone #: 732-36Q8 <br />Date: <br />I. MAJOR SYSTEMS <br />A. <br />B, <br />SUB-AREA CLEANUP & TERMITE TREATMENT <br />Page 2 of 15 <br />1. At entire sub-area of house, remove debris to a size small enough to be <br />raked, Fill existing hole in soil in left front azea to top of surrounding <br />grade using excavation spoils from foundation and French drain work. <br />Fill area is approximately 5' x 5' x 18"deep. Supply and install 6-mil <br />plastic vapor bazrier throughout entire sub-area of house so as to provide <br />moisture protection. <br />2. Chemically treat entire perimeter of house for termite and pest control. <br />Chemical treatment to be done by a licensed termite or pest control <br />company. Contractor to provide owner with written proof' and warranty of <br />treatment. <br />FOUNDATION <br />1. Clear loose soil and debris from concrete/brick footing at front of house, <br />from left front porch curtain wall extending approximately 8 l.f to the <br />right. Supply and install approximately 8 l.f of concrete underpinning <br />under existing concrete/brick footing at front of house approximately 4" <br />out from widest existing point of footing and to level with top of existing <br />concrete. Includes one #4 rebaz top and bottom. New materials to match <br />existing as close as practical. <br />2. Provide temporary support adjacent to wood column screw jack girder <br />supports in front area of crawlspace under the house. <br />Remove 2 existing wood columns and one existing screw jack, keep screw <br />,jack for re-installation. Remove existing wood girder and three wood <br />pads. Level-off soil immediately under pads and prepare these three areas <br />for installation of new concrete block footings. Supply and install three <br />new concrete footings, each of 4 - 8" x 8" x 16" concrete block, top two <br />concrete block to be turned 90 degrees and set on two bottom block, fill <br />voids in blocks with concrete, at same locations, complete. Includes <br />treated wood block on top of each footing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.