Browse
Search
Agenda - 08-22-2006-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:29:49 PM
Creation date
8/29/2008 9:39:52 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name; Mr. And Mrs. Grasty Page 11 of 15 <br />Address: 119 Hayes Street <br />City: Hillsborough <br />Phone #: 732-3608 <br />Date: <br />G. EXTERIOR DOORS <br />1. Remove existing rear exterior door and frame in storage room and prepare <br />opening for installation of new pre-hung exterior door. Supply and install <br />new pre-hung 9-light exterior door. Includes all hazdware, keyed lockset, <br />deadbolt and trim, complete, <br />2. Prepaze new rear exterior door and frame in storage room for installation <br />of new storm door. Supply and arstall new storm door including all <br />hardware, closure, and lockable latch, complete. <br />H. INSULATION & WEATHERIZATION <br />L Supply and install new batt insulation of R-19 value to accessible portion <br />of under-floor of house, forward'/n of crawlspace, approximately 675 sq., <br />ft., complete. <br />14 <br />2. Supply and install additional new batt insulation to achieve R-30 value to <br />horizontal portions of front and rear attic over living az'ea of house, <br />approximately 420 sq. ft.. Re-install existing batt insulation to <br />vertical/wall portions of fi°ont and rear attic areas, complete. <br />3. Supply and install new weatherstripping and weatherizing threshold on <br />existing I{itchen/storage room door, complete. <br />I.. PAINTING <br />Protect adjacent srufaces and personal possessions with appropriate <br />temporary coverings and enclosures. Fully prepare interior and exterior of <br />new rear door, door casing and door trim to receive new paint. Prime all <br />new materials. Supply and install new paint to interior and exterior of new <br />rear door, door casing and door trim and restore to proper wonting order. <br />Interior door, door casing and door trim to be painted with semi-gloss <br />interior latex, Exterior door, door casing and door trim to be painted with <br />semi-gloss exterior latex.. Color choice by Owner. Finish paint shall <br />provide sufficient coverage to prevent previous colors from showing <br />through. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.