Browse
Search
Agenda - 08-22-2006-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:29:49 PM
Creation date
8/29/2008 9:39:52 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />Name: Mr. And Mrs, Grasty Page 10 of 15 <br />Address: 1 19 Hayes Street <br />City: Hillsborough <br />Phone #: 732-3608 <br />Date: <br />F. IvLECHANICAL <br />1. Supply and install mastic sealant material to all HVAC register boots to <br />provide weather-tight seal between boot and floor/wall, complete, Sealant <br />to be left smooth and uniform with floor/wall surface. <br />2, In front attic, remove approximately 12 l.f: of damaged HVAC ducting . <br />Supply and install approximately 12 Lf: of new insulated flexible HVAC <br />ducting at same location, with R-6 rating, including proper connection to <br />existing supply duct and two existing registers, complete. New materials <br />to match existing as close as practical.. <br />3, Supply and install galvanized metal hood over existing HVAC duct <br />housing for ducts extending from exterior gas pack unit through <br />foundation wall. New hood to extend under bottom edge of existing lap <br />siding, to be removable and provide weathertight barrier. Seal transitions <br />from new hood to existing metal housing. New materials to match <br />existing as close practical. <br />4. Provide temporary support under each side of existing water heater <br />platform to maintain proper service connections to water heater. <br />Temporary disconnection of existing plumbing, electrical, gas or other <br />utilities which become necessazy during course of project shall be <br />performed in an efficient, worlananlike manner so as to keep "down time" <br />and temporary connections to a minimum, Partially remove existing <br />temporary support under platform to accommodate excavation for new <br />block support.. Excavate under left and right front comers of platform to <br />solid soil to accommodate installation of new solid concrete block support, <br />Supply and install new concrete block support under left and right front <br />corners of platform, with mortar packed between top of block and bottom <br />ofplatform, complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.