Browse
Search
Agenda - 08-22-2006-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:29:49 PM
Creation date
8/29/2008 9:39:52 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />Names Mr. And Mrs. Grasty <br />Address: 119 Hayes Street <br />City: Hillsborough <br />Phone #: 732-36Q8 <br />Date: <br />Page 9 of 15 <br />17. Remove existing florescent light fixture in Kitchen area adjacent to <br />Laundry. Supply and install new florescent light fixture, to match existing <br />as close is practical, at same location, complete.. <br />18. Supply and install new electrical to accommodate one new light fixture in <br />Laundry closet with switch control located on right side wall inside closet. <br />Supply and install new fixture, complete. All work to code, <br />19. Properly disconnect wiring to existing switch in upstairs room. Supply <br />and install new junction box and properly connect electrical to restore to <br />proper working order, complete. <br />20. Supply and install new ceiling light fixture at existing location to replace <br />missing fixture in upstairs room, complete. New fixture to match existing <br />as close as practical.. <br />21. Remove existing electrical wire from rear house fascia/soffit. Supply and <br />install new junction box, conduit and wiring and connect to two existing <br />exterior lights at each rear corner of house and restore to proper working <br />order, complete <br />22. Remove existing exterior outlet on rear wall of storage room. Supply and <br />install new grounded, weatherproof; and duplex outlet at same location, <br />complete, <br />
The URL can be used to link to this page
Your browser does not support the video tag.