Browse
Search
Agenda - 08-22-2006-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 08-22-2006
>
Agenda - 08-22-2006-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:29:49 PM
Creation date
8/29/2008 9:39:52 AM
Metadata
Fields
Template:
BOCC
Date
8/22/2006
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20060822
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Name: Mr. And Mrs, Grasty <br />Address: 119 Hayes Street <br />City: Hillsborough <br />Phone #: 732-3608 <br />Date: <br />Page 8 of 15 <br />including one switch conhol located in crawlspace within .3 l,f. of access <br />opening. Supply and install new fixtures, complete. <br />9. Remove six existing two-prong electrical outlets inside of'house located as <br />follows: Z in Living Room, 3 in Bedroom, and 1 in Laundry closet. <br />Supply and install new grounded tluee-prong duplex outlets at same <br />locations and restore to proper working order, complete. <br />10. Supply and install electrical ,junction boxes, conduit, wiring, outlets, and <br />grounding, complete, necessary to provide additional duplex outlets as <br />follows: 1 in Living Room, and 2 in Dining Room, <br />11, Supply and install approximately ten box extenders at receptacles and <br />switches adjacent to wall paneling throughout interior of house, <br />12, Supply and install one new GFI outlet in Batluoom, $ <br />13. Supply and install four new GFI outlets in IGtchen; one on each side of <br />sink and two above each end of adjacent side counter. <br />$ <br />14. Supply and install one new GFI outlet in Laundry area. $ <br />15. Supply and install arc fault interrupter circuits on Bedroom circuit and <br />upstairs room. <br />$ <br />16. Supply and install new electrical to accommodate installation of new <br />"direct-wired" smoke detectors in Hall, Bedroom, and upstairs room. <br />Supply and install new "direct-wire" smoke detectors, complete,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.