Browse
Search
Agenda - 01-23-2018 5-a - Zoning Atlas Amendment - Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Settlers Point
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 01-23-2018
>
Agenda - 01-23-2018 5-a - Zoning Atlas Amendment - Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Settlers Point
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 10:29:32 AM
Creation date
1/22/2018 8:39:32 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda - 01-23-2018 - Regular Meeting Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 01-23-2018
Minutes 01-23-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
Statement of Approval and Consistency Statement - Settler's Point 012318
(Message)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ;7 <br />List of Revised Figures: <br />Figure 11A <br />Figure 11B <br />Figure 11C <br />Figure 12A <br />Figure 12B <br />Figure 12C <br />Figure 21R <br />Figure 22R <br />Figure 25A <br />Figure 25B <br />Figure 25C <br />Figure 27R <br />Settler's Pointe Development Hillsborough, NC <br />Traffic Impact Study <br />504 Meadowlands Drive, Hillsborough, NC 27278 <br />Warehouse Site Trip Volumes at 850,000 SF <br />Warehouse Site Trip Volumes at 900,000 SF <br />Warehouse Site Trip Volumes at 1,248,000 SF <br />2020 Build Volumes at 850,000 SF Warehouse <br />2020 Build Volumes at 900,000 SF Warehouse <br />2020 Build Volumes at 1,248,000 SF Warehouse <br />2022 Buildout Site Trip Volumes <br />2022 Buildout Site + Background Volumes <br />2020 Proposed Operations at 850,000 SF Warehouse <br />2020 Proposed Operations at 900,000 SF Warehouse <br />2020 Proposed Operations at 1,248,000 SF Warehouse <br />2022 Proposed Operations at Buildout <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.