Browse
Search
Agenda - 01-23-2018 5-a - Zoning Atlas Amendment - Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Settlers Point
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 01-23-2018
>
Agenda - 01-23-2018 5-a - Zoning Atlas Amendment - Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Settlers Point
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 10:29:32 AM
Creation date
1/22/2018 8:39:32 AM
Metadata
Fields
Template:
BOCC
Date
1/23/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda - 01-23-2018 - Regular Meeting Agenda
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 01-23-2018
Minutes 01-23-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
Statement of Approval and Consistency Statement - Settler's Point 012318
(Message)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />STAFF COMMENT. At its January 10, 2018 meeting, the Board <br />voted unanimously to recommend approval of the proposed utility <br />conditions as contained in Attachment 11. <br />2. Transportation Impact Analysis (TIA): On December 4, 2017 the applicant <br />submitted a revised TIA providing additional detail on anticipated traffic <br />impacts /required improvements associated with the project. This was in response to <br />staff requests for additional detail. A summary of recommended improvements as <br />contained within the revised TIA (Attachment 6) is as follows: <br />Recommended improvements for the 2020 Build Phase are: <br />a. Install a traffic signal at the intersection of Old NC 86 & 1 -40 westbound, <br />required for Certificate of Compliance of any square footage build. <br />b. Construct the second lane of the 1 -40 East on ramp, and re- stripe the <br />southbound lanes of Old NC 86 at the 1 -40 East ramp for dual left turns, at <br />any level of build. <br />c. Install a traffic signal at the intersection of Old NC 86 & 1 -40 eastbound, <br />required for Certificate of Compliance of any square footage build. <br />d. Install a continuous right turn lane on south bound Old NC 86 between the <br />1 -40 East off ramp and the Service Road, at any level of build. <br />e. Construct a continuous right turn lane on north bound Old NC 86 between <br />the Service Road and the 1 -40 East on ramp, at any level of build. <br />Construct a right turn lane on the Service Road at Old NC 86 with 200 feet <br />of storage and taper, for initial construction of facilities, at any level of build. <br />f. Construct a left turn lane on northbound Old NC 86 at the Service Road <br />with 150 feet of storage and taper, at any level of build. <br />g. Construction of a left -in /right -in /right out access for the Service Road at Old <br />NC 86 upon construction of greater than 900, 000 square feet of warehouse <br />facility. <br />h. Construction of a super - street type U -Turn bulb intersection to be located <br />approximately 1, 000 feet south of the Service Road on Old NC 86, with 200 <br />feet of storage and taper, upon construction of greater than 900,000 square <br />feet of warehouse facility. <br />i. Construction of a right turn lane on Old NC 86 southbound at Davis Road <br />with 150 feet of storage and taper, upon construction of 900,000 square feet <br />of warehouse facility. <br />Recommended improvements for the 2022 Buildout Phase are: <br />i. Construct a full access on Old NC 86 at the location of the U -Turn <br />intersection installed under the 2020 Phase 1 Build, with two exiting lanes <br />and one entering lane. Construct a right turn lane with 125 feet of storage <br />and taper on the westbound approach, a thru -right turn lane on the <br />northbound approach with 200 feet of storage and taper, and a second <br />southbound left turn lane with 300 feet of storage and taper. <br />ii. Install a traffic signal at the intersection of Old NC 86 new retail access/U- <br />Turn intersection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.