Browse
Search
12-6 - Information Item - Memorandum - SPOT 5.0 Local Input Point Process – TARPO and DCHC MPO
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 01-23-2018
>
12-6 - Information Item - Memorandum - SPOT 5.0 Local Input Point Process – TARPO and DCHC MPO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 5:21:42 PM
Creation date
1/19/2018 5:21:10 PM
Metadata
Fields
Template:
BOCC
Date
1/23/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
12-6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />The final list and point allocation will be provided to the TARPO Board for final approval. <br />TARPO will also post the list on its website at http://www.tarpo.org/topics/spot5.shtml and a <br />public hearing will be conducted by the TARPO Board. <br />Attachment 1 - TARPO process - provides additional details. <br /> <br />DCHC MPO Local Input Point Process <br />Points will be allocated to the projects that help achieve the adopted Metropolitan <br />Transportation Plan goals and align with the MPO’s priorities. Public involvement and <br />collaboration with NCDOT also play an important part in the qualitative process. <br />Coordination with NCDOT Division Engineers will help ensure priority projects in the MPO <br />have the best funding opportunity in the next Strategic Transportation Improvement <br />Program (STIP). <br />DCHC MPO has already received NCDOT guidance for crafting an approvable input point <br />process which involves two qualitative criteria to determine how points will be allocated. <br />The first step is ranking DCHC MPO projects based on the following six-point scale: <br />Criteria Maximum <br />(Highway) <br />Maximum <br />(Non-Highway) <br />MTP Prioritization <br /> Project planned for near-term (by MTP 2025 Threshold) 2 <br /> Project planned for mid-term (by MTP 2035 Threshold) 1 <br /> Project planned for long-term (by MTP 2045 Threshold) 0 <br />Consistent with Adopted Regional or Local Plan 2 <br />Preliminary Engineering or Engineering Study Completed or <br />Underway <br /> 1 <br />Allocation of local tax revenues through a DCHC-member <br />jurisdiction voter supported referendum <br />1 1 <br />DCHC-member jurisdiction demonstrates local funding <br />towards progress in project <br />1 <br />Project complements non-highway transportation facility 1 1 <br />Project supports Environmental Justice Community of <br />Concern <br />1 1 <br />TOTAL MAXIMUM 6 6 <br />NCDOT has been granted 1,800 points to allocate for Regional Impact and Divisional <br />Needs and is allowed to assign a minimum of 4 points to a maximum of 100 points to each <br />project. The point distribution below is designed to reflect the MPO’s adopted MTP funding <br />goals. <br />Regional Divisional <br />800 Highway 300 Highway <br />500 Public Transit 500 Public Transit <br />500 any mode/project 500 Bicycle & Pedestrian <br /> <br />500 any mode/project <br />2
The URL can be used to link to this page
Your browser does not support the video tag.