Orange County NC Website
<br />Revised 10/17 <br /> <br /> <br />6 <br /> <br />e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its <br />entirety without the prior written consent of the Owner. <br /> <br />9. CONSEQUENTIAL DAMAGES <br /> <br />a. Owner and Contractor mutually waive any claim against each other for consequential damages. <br />Consequential Damages include: <br /> <br />(i) Damages incurred by Owner for loss of use, income, financing, or business. <br /> <br />(ii) Damages incurred by Contractor for office expenses, including personnel, loss of <br />financing, profit, income, business, damage to reputation, or any other non-direct <br />damages. <br /> <br />10. ENTIRE AGREEMENT <br /> <br /> All of the documents listed, referenced or described in this Agreement, the written Notice-to-Proceed, <br />together with Modifications made or issued in accordance herewith are the Contract Documents, and the work, <br />labor, materials, and completed construction required by the Contract Documents and all parts thereof is the <br />Work. The Contract Documents constitute the entire agreement between Owner and Contractor. This <br />Agreement may be amended only by written instrument signed by both parties. Modifications may be <br />evidenced by facsimile signatures. If any provision of the Agreement or General Conditions shall be declared <br />invalid or unenforceable, the remainder of the Agreement shall continue in full force and effect. <br /> <br />[SIGNATURE PAGE TO FOLLOW] <br />9