Browse
Search
8-i - Construction Bid Award for Passmore Center Expansion
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 01-23-2018
>
8-i - Construction Bid Award for Passmore Center Expansion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 5:14:07 PM
Creation date
1/19/2018 5:12:18 PM
Metadata
Fields
Template:
BOCC
Date
1/23/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-i
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br /> <br />Revised 10/17 <br /> <br />the previous calendar month, and shall sum up the financial status of the Work with the <br />following information: <br /> <br />a) Total Contract Price, including any adjustment thereto made pursuant to the Contract <br />Documents. <br /> <br />b) Value of Work completed and materials properly stored to date. <br /> <br />c) Less amount retained. <br /> <br />d) Less previous payments. <br /> <br /> e) Current amount due. <br /> <br />f) Balance remaining. <br /> <br />The Contractor, upon request of the Designer, shall substantiate the request with invoices, <br />vouchers, payrolls, or other evidence. <br /> <br />20.3 When payment is requested or made on an account of stored materials, such materials <br />must be stored on the Owner's property at such places and in such a manner as may be <br />designated by the Designer. However, in the sole discretion of the Owner, with permission <br />in writing from the Designer and Owner and under such circumstances as may be determined <br />by the Owner, such materials may be stored in a bonded warehouse. The location and <br />conditions for storage of such materials away from the Owner's property in a bonded warehouse <br />shall be within the sole discretion of the Owner. Requests for Payment on account of stored <br />materials shall be accompanied by paid invoices, bills of sale, warehouse receipts, or other <br />documentary evidence establishing Owner's title to such materials, evidence that the stored <br />materials are insured against loss and damage, and such other documentation as required by <br />the Designer. Responsibility for the quantity, quality, and condition of such stored materials, <br />whether stored on the Owner's property or away from the Owner's property, shall remain with <br />the Contractor regardless of ownership or title. No payment shall be made on account of <br />materials stored in a bonded warehouse unless the Contractor has acquired written permission <br />from the Designer for such storage of materials and has complied with all conditions set forth in <br />such permission regarding such storage of materials in a bonded warehouse. <br /> <br />20.4 Any Request for Payment received by the Designer on or before the fifth (5th) of the <br />calendar month shall be certified for payment or returned for re-submission to the Contractor on <br />or before the fifteenth (15th) of the calendar month. The Designer's certification shall be for the <br />amount which was requested or that which the Designer has decided was justly due, and shall <br />state in writing to the Contractor and Owner the reasons for withholding payment of any or all of <br />the amount requested. <br /> <br />20.5 The Designer may fail to certify all or part of any payment requested for any of the <br />following reasons: <br /> <br />a) Defective Work not corrected. <br /> <br />48
The URL can be used to link to this page
Your browser does not support the video tag.