Browse
Search
5-a - Zoning Atlas Amendment - Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Settlers Point
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 01-23-2018
>
5-a - Zoning Atlas Amendment - Conditional Zoning – Master Plan Development Conditional Zoning District (MPD-CZ) Settlers Point
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 4:53:14 PM
Creation date
1/19/2018 4:48:19 PM
Metadata
Fields
Template:
BOCC
Date
1/23/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5-a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Settler’s Pointe Development Hillsborough, NC <br />Traffic Impact Study a <br /> <br />Executive Summary – Supplemental Revision <br /> <br />A Traffic Impact Analysis was performed and submitted for a development in Orange County, N.C. near <br />Hillsborough for multiple land use types as part of a re-zoning for a master plan for the development. <br />The original proposal has since been modified to remove from consideration at this time, all the <br />residential uses that were proposed. Subsequently, the TIA has been revised to reflect these changes, <br />and recommendations made that are appropriate for the level of development proposed. Additionally, a <br />request was made to review the analysis for the Phase I Build options, to provide additional detail as to <br />what stages of Build scenarios will create the need for roadway improvements. <br /> <br />The trip generation for the proposed site has been reduced by all of the residential components only. All <br />internal capture trips remain as they were since the submitted TIA did not capture internal trips from the <br />residential parcels. Also, residential trips in a TIA do not get reduced for pass-by trips, so all pass-by trips <br />have been included as proposed in the submitted TIA. Table 1 below summarizes the trip generation for <br />this revision. <br /> <br /> <br /> <br /> <br />The development is being proposed on parcels on both sides of Old NC 86, will be constructed in two <br />phases, a light industrial/warehouse parcel west of Old NC 86 completed by 2020, and a <br />retail/office/hotel parcel on the east side of Old NC 86 completed by 2022. <br /> <br />92
The URL can be used to link to this page
Your browser does not support the video tag.