Orange County NC Website
a. Install a traffic signal at the intersection of Old NC 86 & I-40 137 <br />westbound, required for Certificate of Compliance of any square 138 <br />footage build. 139 <br />b. Construct the second lane of the I-40 East on ramp, and re-stripe 140 <br />the southbound lanes of Old NC 86 at the I-40 East ramp for dual 141 <br />left turns, at any level of build. 142 <br />c. Install a traffic signal at the intersection of Old NC 86 & I-40 143 <br />eastbound, required for Certificate of Compliance of any square 144 <br />footage build. 145 <br />d. Install a continuous right turn lane on south bound Old NC 86 146 <br />between the I-40 East off ramp and the Service Road, at any level 147 <br />of build. 148 <br />e. Construct a continuous right turn lane on north bound Old NC 86 149 <br />between the Service Road and the I-40 East on ramp, at any level 150 <br />of build. Construct a right turn lane on the Service Road at Old NC 151 <br />86 with 200 feet of storage and taper, for initial construction of 152 <br />facilities, at any level of build. 153 <br />f. Construct a left turn lane on northbound Old NC 86 at the Service 154 <br />Road with 150 feet of storage and taper, at any level of build. 155 <br />g. Construction of a left-in/right-in/right out access for the Service 156 <br />Road at Old NC 86 upon construction of greater than 900,000 157 <br />square feet of warehouse facility. 158 <br />h. Construction of a super-street type U-Turn bulb intersection to be 159 <br />located approximately 1,000 feet south of the Service Road on Old 160 <br />NC 86, with 200 feet of storage and taper, upon construction of 161 <br />greater than 900,000 square feet of warehouse facility. 162 <br />i. Construction of a right turn lane on Old NC 86 southbound at Davis 163 <br />Road with 150 feet of storage and taper, upon construction of 164 <br />900,000 square feet of warehouse facility. 165 <br />Recommended improvements for the 2022 Buildout Phase are: 166 <br />i. Construct a full access on Old NC 86 at the location of the U-Turn 167 <br />intersection installed under the 2020 Phase I Build, with two exiting 168 <br />lanes and one entering lane. Construct a right turn lane with 125 169 <br />feet of storage and taper on the westbound approach, a thru-right 170 <br />turn lane on the northbound approach with 200 feet of storage and 171 <br />taper, and a second southbound left turn lane with 300 feet of 172 <br />storage and taper. 173 <br />ii. Install a traffic signal at the intersection of Old NC 86 new retail 174 <br />access/U-Turn intersection. 175 <br />iii. Construct an additional lane on Old NC 86 southbound, continuous 176 <br />between the Service Road and the new Retail Dr. intersection. Re-177 <br />stripe the inside lane for left turns at the signalized intersection. 178 <br />iv. Construct an additional lane on the Old NC 86 northbound, 179 <br />continuous between the new signalized Retail Dr. and the Service 180 <br />Road. 181 <br />86