Orange County NC Website
<br />SUMMARY OF MAJOR QUESTIONS/RESPONSES <br />ON SETTLERS POINT <br />FROM NOVEMBER 14, 2017 PUBLIC HEARING <br /> <br />1. What are the benefits of developing a project through the MPD-CZ <br />process? <br />One of the primary benefits of the MPD-CZ process is that we are able to <br />review/process the development of multiple parcels under a uniform set of <br />development criteria where there are shared opportunities for infrastructure <br />development (i.e. parking areas, preservation of existing landscaping, outdoor <br />lighting, signage, etc.). <br />If these parcels were developed independently under existing zoning regulations, <br />each individual parcel would be developed as its own entity with little to no <br />opportunity for the County to compel coordination of development activities. <br />Each parcel would have to have its own parking area, stormwater feature, <br />landscape buffers, allowable building area (i.e. floor area ratio), individual <br />outdoor lighting fixtures, etc. From staff’s standpoint this translates into more <br />development activity, more impervious surface area, and increased opportunities <br />for impacts. <br />2. Why are the applicants not required to submit a site specific development <br />plan? <br />Applicable provisions of the Unified Development Ordinance (UDO) do not <br />require submittal of site specific development plans as part of the Master Plan <br />Development Conditional Zoning (MPD-CZ) process. <br />As detailed in the abstracts for both the Planning Board and the BOCC, the <br />MPD-CZ process involves the approval of a rezoning petition and a master <br />development plan allowing for the proposed development of specific land use(s) <br />on parcel(s) of property. Applications are processed in a legislative manner (i.e. <br />does not require sworn testimony or evidence) and decisions are based on the <br />BOCC’s determination that the project is consistent with the purpose and intent <br />of the Comprehensive Plan. <br /> The County is, essentially, being asked to allow for the creation of a new zoning <br />district establishing mandatory development criteria as well as a list of permitted <br />land uses. If approved, the Zoning Atlas will be amended and the zoning <br />designation of the property shall be changed to MPD-CZ. <br />Development would have to be consistent with the approved development <br />proposal and all conditions imposed as part of the zoning atlas amendment <br />process. Development of the property, specifically allowable land uses, will be in <br />accordance with the newly created zoning district in accordance with the <br />approved master plan and any imposed conditions. <br />Typically with a general use rezoning, the County cannot make specific requests <br />for information on ‘exactly’ what land use(s) will be developed if a rezoning <br />Attachment 3 <br />54