Browse
Search
2017-649-E AMS - Alley, Williams, Carmen & King, Inc. for construction admin services for shower install at CGCC
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-649-E AMS - Alley, Williams, Carmen & King, Inc. for construction admin services for shower install at CGCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 9:40:24 AM
Creation date
12/12/2017 7:45:10 AM
Metadata
Fields
Template:
Contract
Date
10/25/2017
Contract Starting Date
10/25/2017
Contract Document Type
Agreement - Consulting
Amount
$8,200.00
Document Relationships
R 2017-649-E AMS - Alley, Williams, Carmen & King, Inc. for construction admin services for shower install at CGCC
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:00D5239D-4390-42F1-AA3B-CB88F2EE7089 <br /> alley, williams, carmen & king, inc. <br /> Engineering • Architecture • Land Surveying <br /> October 11, 2017 <br /> Angel Barnes <br /> Capital Projects Manager <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> Hillsborough, NC 27278 <br /> Re: Architectural and Engineering Fee Proposal <br /> Dear Angel: <br /> I appreciate the opportunity to provide you with a proposal for design services for the shower addition at <br /> the Cedar Grove Community Center. In order to estimate a fee for design and construction <br /> administration I have made a few assumptions such as including a toilet and lavatory in the shower room, <br /> concrete masonry units for walls and having the ability to connect to existing water and sewer in the <br /> adjacent restrooms. Also due to the size of the project I assume it will be bid informally. <br /> Our proposal including design, bidding and construction administration is estimated at$8,200. <br /> The following services are not included in the above fee proposal but can be provided for additional fee: <br /> • Printing and copying costs <br /> • Geotechnical, environmental, or other testing services. <br /> • Hazardous materials (asbestos, lead paint, etc.) abatement design <br /> • Local, State and/or Federal Permits and/or fees. <br /> • Color renderings <br /> 4cerely, <br /> litoth __..„ <br /> Jeffrey S Joh -.n, Al* CARB <br /> Alley„ #,"Hams Carmen & King, Inc. <br /> c. Kenneth D. Stafford, AIA, LEED <br /> i <br /> 740 Chapel Hill Road (27215) - P O Box 1179 - Burlington, North Carolina 27216 <br /> Tel - (336)226-5534 - Fax—(336)226-3034 - awck.com <br /> ESTABLISHED 1960 <br />
The URL can be used to link to this page
Your browser does not support the video tag.