Orange County NC Website
DocuSign Envelope ID:2B387EC1-ED80-46E6-BC22-4F91ABE452FB <br /> iy� �4h°u l <br /> 1 u y Y %1111 Jeli�laiii llll J r/1)I l i r 1 1 1001 11 1 11 11101101 111 III <br /> I 1 11111111 11111 <br /> Report <br /> Upon completion of testing and engineering analysis, we will prepare a written engineering report that <br /> presents our findings and preliminary recommendations. The preliminary engineering report will <br /> include the following items: <br /> a. Observations from our site reconnaissance including current site conditions, surface drainage <br /> features, and surface topographic conditions. <br /> b. A review of the published geologic conditions and their relevance to your planned development. <br /> c. A subsurface characterization and a description of the field exploration and laboratory tests <br /> performed. <br /> d. Final logs of the soil borings and records of the field exploration prepared in accordance with <br /> the standard practice for geotechnical engineering. A boring location plan will be included, and <br /> the results of the laboratory tests will be plotted on the final boring logs or included on a <br /> separate test report sheet. <br /> e. Preliminary foundation recommendations. <br /> f. Preliminary recommendations for slab-on-grade construction. <br /> g. Evaluation of the on-site soil characteristics encountered in the soil borings. Specifically, we will <br /> discuss the suitability of the on-site materials for reuse as engineered fill. We will also include a <br /> discussion of the excavation characteristics of the encountered materials, compaction <br /> requirements, and suitable material guidelines. <br /> h. Preliminary pavement recommendations. <br /> Recommendations for seismic site classification in accordance with the 2012 North Carolina <br /> Building Code. <br /> j. Recommendations for additional testing and/or consultation that might be required to complete <br /> the geotechnical assessment and related engineering for this project. <br /> Il mu,:illiiity Clearance <br /> We will contact North Carolina One Call to locate underground utilities at the site; however, our <br /> experience indicates that North Carolina One Call will not locate utilities beyond the point of distribution <br /> (meters or gauge points) on private property. We will coordinate our test boring/pit locations in order <br /> to avoid any underground utilities indicated by the North Carolina One Call locating system. To facilitate <br /> safety for the public, the structure and ECS and due to the developed nature of the site, a private <br /> utility locating service is required for this project. Our lump sum fee includes the cost for ECS to <br /> retain a private locator service to locate utilities beyond the meters and public utilities at the site. ECS <br /> Mnllll MiN <br /> 1 r ,l 1 I(, rar /r)',/i%—(;1' <br /> 44,00 4Ni4Nil <br />