Orange County NC Website
onnunign Envelope ID:raonuF1/+1rna-400A-9oAo-7AA*o1cocose <br /> • Prepare and Provide 95% complete documents to Grounded and Smith Sinnett (for client review <br /> and for use as Final Site Permit Approvals with Town of Chapel Hill) <br /> o Site Layout/Materials Plan(s) for Phase Ill elements <br /> o Site Details for Phase Ill elements <br /> o <br /> Grading Plan(s) for Phase U| elements <br /> o Planting/Landscape Plan(s) and Details for Phase Ill area <br /> o Technical Specifications for sections associated with Phase Ill elements <br /> • Prepare and Provide 98% complete documents to Grounded and Smith Sinnett (for client review <br /> and for use as Final Site Permit Approvals with Town of Chapel Hill) <br /> o Site Layout/Materials Plan(s) for Phase Ill elements <br /> o Site Details for Phase III elements <br /> n <br /> Grading Plan(s) for Phase III elements <br /> o Planting/Landscape Plan(s) and Details for Phase Ill area <br /> o Technical Specifications for sections associated with Phase Ill elements <br /> • Prepare and Provide Bidding/Construction Document Submittal (100% complete documents) to <br /> include the following: <br /> o Site Layout/Materials Plan(s) for Phase Ill elements <br /> o Site Detail for Phase Ill elements <br /> o Grading Plan(s) for Phase Ill elements <br /> o Planting/Landscape Plan(s) and Details for Phase Ill area <br /> o Technical Specifications f or sections associated with Phase III elements <br /> TASK 1 1 (Optional) - Adult Play Space Construction Observation (Phase 1): <br /> This task would include work solely by Site Collaborative. It is expected that the following services will occur <br /> over a 12,month time period related only to the sheets sealed by Site Collaborative staff and concurrently with <br /> the work described in Task 3, <br /> • During bidding, answer questions and/or add needed information to Bid Addenda issued by <br /> Smith Sinnett. <br /> • Conduct shop drawing and contractor submittal reviews as needed. <br /> • Review Requests for Information or Clarification from the contractors. <br /> • Review Change Order Proposals from the contractors. <br /> • Attend regularly scheduled construction meetings. Assume a 10'month active construction <br /> schedule with up to three (3) construction meetings for SITE COLLABORATIVE. <br /> • Concurrently with above noted regularly scheduled construction meetings, SITE COLLABORATIVE <br /> will conduct site visits during active construction periods to review construction situations and <br /> provide input to ensure that the intent of the drawings is being constructed. For each site visit, a <br /> written and graphic field report of items will be produced for the contractor(s) and project <br /> owner to review, assess, and correct. Assume up to one (1) visits/field reports for SITE <br /> COLLABORATIVE. <br /> • Conduct substantial completion punchlist site visit/walkthrough with a written substantial <br /> completion punchlist outlining any outstanding items for the contractor to resolve in <br /> accordance with the bid and construction document. <br /> Box 3/132 <br /> ]�.� Raleigh, � <br /> NC � � � ) L � ^ /v ~_� <br /> - - -_ <br /> ��� ���J��|����[�|�J�� <br /> ��� pm��oo»v� �-/ "~~^/' `^-^-'^'' "�^ <br />