Browse
Search
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 1:48:04 PM
Creation date
12/11/2017 7:12:46 AM
Metadata
Fields
Template:
Contract
Date
11/1/2017
Contract Starting Date
11/1/2017
Contract Document Type
Agreement - Consulting
Agenda Item
11/2/2017
Amount
$889,540.00
Document Relationships
2019-518-E AMS - Smith Sinnett Architecture Southern Campus contract amendment 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
onnunign Envelope ID:raonuF1/+1rna-400A-9oAo-7AA*o1cocose <br /> o Work to help Smith Sinne1f establish priority list of desires needs from workshop and thus help <br /> to establish consensus on expected outcomes <br /> • One (1) site design review meeting with key stakeholders (plus meeting preparation and <br /> design/sketch materials for meeting) <br /> o it is expected that the presentation graphics will include color-rendered campus alternative <br /> design enlargements of specific areas of focus within compVs, and site images (existing, <br /> historic, and/or precedent) <br /> • Up to two (2) project review meetings w/ County staff <br /> • One (l) site visit to observe site conditions and site operations <br /> • One (1) presentation to County Commissioners to discuss Schematic Design package site elements <br /> • One (1) meeting with Town of Chapel Hill reviewers <br /> • Up to two (2) internal design team coordination meetings <br /> • As needed internal consultant team meetings, emails, and phone calls for coordination, project <br /> review, and to guide schedule compliance (particularly with Grounded Engineering) <br /> • As needed, communication with Grounded and Smith Sinnett project managers via emails and <br /> phone calls <br /> • As needed, provide answers and documents to Smith Sinnett's cost estimator <br /> • Prepare and submit combined Schematic Design/Design Development Documents to Grounded <br /> and Smith Sin neff <br /> o Rendered Site Plan with labels of Phase Ill elements <br /> o Conceptual grading & drainage plan of Phase III elements <br /> o Conceptual landscape plan of Phase Ill elements <br /> TASK 10 (Optional) — Adult Play Space Construction Documents (Phase 1): <br /> This task would include work solely by Site Collaborative. It is expected that the following services will occur over <br /> a 4-month time period concurrently with the work described in Task 2. <br /> • Up to one (1) project review meeting w/ County staff <br /> • Up to one (1) meeting with Town of Chapel Hill reviewers <br /> • Up to two (2) infernal design team coordination meetings <br /> • As needed internal consultant team meetings, emails, and phone calls for coordination, project <br /> review, and to guide schedule compliance (particularly with Grounded Engineering) <br /> • As needed, communication with Grounded and Smith Sinnett project manager via emails and <br /> phone calls <br /> • As needed, provide answers and documents to Smith Sinneft's cost estimator <br /> • As needed, discuss code/permit requirements with regulatory staff <br /> • Prepare and Provide 90% complete documents to Grounded and Smith Sinnett (for client review <br /> and for use as Final Site Permit Approvals with Town of Chapel Hill) <br /> o Site Layout/Materials Plan(s) for Phase 111 elements <br /> o Site Details for Phase Ill elements <br /> o Grading Plan(s) for Phase III elements <br /> o Planting/Landscape Plan(s) and Details for Phase Ill area <br /> o Technical Specifications for sections associated with Phase Ill elements <br /> � ,U��x 37132 ' <br /> Raleigh, � � �� <br /> 4110:NN www.gr waded engineering.com � � ENGINEERING <br /> • 919,438.3694 <br />
The URL can be used to link to this page
Your browser does not support the video tag.