Orange County NC Website
onnunign Envelope ID:raonuF1/+1rna-400A-9oAo-7AA*o1cocose <br /> During this phase, Grounded will also provide the required stormwater and erosion control calculations to <br /> support the submittal packages. We understand that Smith Sinnetf Architecture will assemble the submittal <br /> package and deliver it to the Town of Chapel Hill. Upon receipt of Town comments, Grounded will work with <br /> the project team 1oevo|uote and respond to the comments. Grounded will also provide final specification <br /> sections related to scope of services provided by Grounded Engineering for use in the bid documents. <br /> TASK 7 - Stormwater BMP Certification (Phase 2): <br /> The Town of Chapel Hill requires that all stormwater BMF's be observed during construction and certified by a <br /> licensed engineer. Grounded will prepare and submit an engineer's certification for the stormwater BMP <br /> associated with this project. Grounded will review the as-built survey information associated with the BMPs as <br /> provided by the owner or contractor. Grounded will also make up to three (3) site visits during the construction <br /> of the BMPs to observe the installation and take photographs for the final report. Once the information <br /> provided has been reviewed and determined io be in compliance with the construction documents and Town <br /> of Chapel Hill requirements, Grounded will prepare and submit the necessary certification to the Town of <br /> Chapel Hill. <br /> TASK 8 - Construction Observation (Phase 2): <br /> In speaking with Smith Sinnett Architecture, it is our understanding that a construction schedule has not yet <br /> been determined. As soch, after speaking with Smith Sinnett, we have assumed an overall construction <br /> duration of 1 2 months for this phase of the pr 'mct. We have assumed 'that we will need to make 12 site visits <br /> during this phase of construction (10 by Grounded Engineering and 2 by Site Collaborative). These site visits will <br /> be to observe construction activity and/or attend project update meetings. During this phase of the project, <br /> Grounded will assist with addressing any questions presented by the contractor and related to our scope of <br /> work. Once construction begins, Grounded anticipated providing the following services: <br /> • Review of submittals related to the site design scope; <br /> • Assist with response to RF|sne|oted to the Grounded design scope; <br /> • Assist with creation of field directives, requests for pricing and change orders related to the site design <br /> scope; <br /> • Following each site visit, Grounded will prepare a Site Observation Report that will include items such as <br /> observations, observed discrepancies, weather conditions, and photographs of construction operations <br /> and site conditions; <br /> TASK 9 ([}pt/onall - AdVit Play Space Combined SD/DD (Phase 1 ): <br /> This task would include work solely by Site Collaborative. This phase of work relates directly to the evaluation, <br /> assessment, prioritization, and design refinement of the Senior Center campus. It is expected that the following <br /> services will occur over a 4-month time period concurrently with the work described in Task 1. The following <br /> provides a breakdown of our expected scope of work, attendees, and framework for a schedule. <br /> • One (1) introductory meeting with key stakeholders (plus meeting preparation and materials for <br /> meeting) <br /> P.O.Box i � - <br /> � � 0 l �~~~� � <br /> ��� �w� Raleigh. ��� & ^� � , � _� 144Iit,gr, I <br /> ��0�� ^wwgnwn�uo�ma�n zo~ - ' ENGINEERING <br />