Orange County NC Website
onnunign Envelope ID:raonuF1/+1rna-400A-9oAo-7AA*o1cocose <br /> U �� i^ <br /> N�����= I � ���\/�� A �� �� <br /> m "� V ��°, " � � xV '^x / <br /> � � <br /> Fur mcdy Sn pod Fence <br /> September 11, 2017 <br /> Rhondo4ngehu' W4 <br /> Smith Sinnett Architecture <br /> 4600 Lake Boone Trail <br /> Raleigh, NC 27607 <br /> Re: Orange County Southern Campus Expansion <br /> LM Project No: R17.158 <br /> Dear Rhonda: <br /> 1. We are pleased to offer the following REVISED proposal for structural <br /> engineering services in connection with the following scope of work for <br /> the proposed additions to the existing Orange County Southern Campus in <br /> Orange County, North Carolina. Our proposal assumes that existing <br /> building structural drawings are available and we can rely on the accuracy <br /> of these drawings regarding the existing structural systems. Our scope <br /> does not include any structural work in the existing buildings. <br /> ma|e/gxHQ PHASE ONE <br /> • Master Plan for 12,000 SF addition to the existing Seymour Center. LM <br /> sui'c /O� <br /> will attend up to two meetings and provide a narrative for the structure <br /> for this planned addition. <br /> 760� <br /> • Full structural design, construction documents and construction <br /> p administration services for a 2500 SF addition to the existing Seymour <br /> Center. <br /> PHASE TWO <br /> vigin.aBeachoMicc • Full structural design, construction documents and construction <br /> �0a2nou 'e administration services for two additions, a 2500 SF addition for the <br /> County Commissioner's space and a 10,770 SF addition to the health <br /> o,// v� services department. <br /> 3fI62 <br /> H. 7�/ u71 o�za The scope of services does not include construction cost estimating, design of any <br /> structures or scope of work not described above, any services for Special <br /> Inspections or demolition drawings. <br /> aichmono$fUc* <br /> [Ho", Construction administration phase services for Phase One includes submittal <br /> ' ""t review, response to RFI's and up to (2) two site visits during construction. <br /> mc»»`onuV� Construction administration phase services for Phase Two includes submittal <br /> zszze <br /> review, response to RFI's and up to (4) site visits during construction. Additional <br /> O* 34s�n35 <br /> CALCULATE COLLABORATE. CREATE <br />