Browse
Search
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 1:48:04 PM
Creation date
12/11/2017 7:12:46 AM
Metadata
Fields
Template:
Contract
Date
11/1/2017
Contract Starting Date
11/1/2017
Contract Document Type
Agreement - Consulting
Agenda Item
11/2/2017
Amount
$889,540.00
Document Relationships
2019-518-E AMS - Smith Sinnett Architecture Southern Campus contract amendment 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:73052F1A-1733-4B2A-9DAD-7AA401292D5B <br /> Phase Two Scope: New Dental Clinic, Board of Commissioners addition and Health Services Addition <br /> and renovations <br /> Fire Protection: <br /> • Expand existing fire protection system to the new additions <br /> Plumbing: <br /> • Waste and water design for the new addition <br /> • New vacuum and air compressor for dental clinic <br /> Mechanical: <br /> • HVAC system that is modeled to beat ASHRAE 90.1 2010 by 20% <br /> • Modeling to demonstrate compliance <br /> • Renovations for the existing building based on current plan <br /> Electrical: <br /> • Power, lighting, fire alarm and data raceway design for the new additions and renovations <br /> • Assumes service upgrade will be required due to the dental clinic needs and the approximately <br /> 13,000 square foot addition. <br /> • Renovations for the existing building based on current plan <br /> • Generator with automatic transfer switches <br /> Services: <br /> • Site visit for field investigation <br /> • Separate owner meeting with Smith Sinnett <br /> • MEP plan showing space needs <br /> • Design narrative for all trades <br /> Excludes: <br /> 1. Fire pump design. <br /> 2. LEED design. <br /> 3. LCCA's <br /> 4. Geothermal HVAC System <br /> 5. Plumbing beyond 5'-0"of the building. <br /> 6. Site lighting <br /> 7. Conductivity testing <br /> 8. Fire flow test <br /> 9. Commissioning <br /> 10. Structural Engineering <br /> 11. Lightning Protection <br /> 12. Data wiring, switches, routers, etc <br /> 13. Security/camera system <br /> Please call me if you have any questions. <br /> Sincerely, <br /> Steve W. Campbell, P. E. <br /> PROGRESSIVE DESIGN COLLABORATIVE, LTD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.