Browse
Search
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 1:48:04 PM
Creation date
12/11/2017 7:12:46 AM
Metadata
Fields
Template:
Contract
Date
11/1/2017
Contract Starting Date
11/1/2017
Contract Document Type
Agreement - Consulting
Agenda Item
11/2/2017
Amount
$889,540.00
Document Relationships
2019-518-E AMS - Smith Sinnett Architecture Southern Campus contract amendment 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:73052F1A-1733-4B2A-9DAD-7AA401292D5B <br /> 1pH111111111111,11 <br /> k � u i IlllllllllllIII <br /> au I TE IU I <br /> Construction Administration (Phase 1): <br /> The Architect shall provide administration of the contract between the Owner and the Contractor. As <br /> a representative of the Owner, the Architect shall visit the site at intervals appropriate to the stage of <br /> the Contractor's operations, or as otherwise agreed by the Owner and Architect. Typically, we visit the <br /> site once a week and whenever the need arises. The Architect shall not be responsible for the <br /> construction means, methods, techniques, procedures, as these are solely the responsibility of the <br /> Contractor. The Architect shall review contractor pay requests and advise the Owner as to their relative <br /> completeness. The Architect shall review any contractor submittals, RFIs, ASI, produce meeting <br /> minutes, conduct monthly and preconstruction meetings and report all info to the owner and the <br /> contractor to insure that they are in keeping with the construction documentation. The architect <br /> anticipates that the Owner will provide assistance with RFI's and site visits. The architect anticipates a <br /> twelve month construction period. If the construction period should exceed this time frame, the <br /> Architect shall provide additional construction administration services as an additional service, upon <br /> written approval by the Owner. <br /> Programming/Schematic Design (Phase 2): <br /> Phase 2 will consist of various site improvements, a new roof for the existing building and a <br /> comprehensive renovation and expansion of the Southern Human Services Building. The project <br /> includes an expanded Commissioner's meeting facility at the front of the building, a new dental clinic, <br /> expanded health and human service areas and expanded parking. The additions include a 2500 <br /> square foot addition to the County Commissioner meeting space and a 10,770 square foot addition to <br /> the health services department. The existing health department spaces will be reprogrammed and <br /> reconfigured. Discussions/meetings with key personnel will endeavor to garner a thorough <br /> understanding of the workings of each portion of the overall program and how they will work together. <br /> It is anticipated as a part of the overall design process, that we will hold meetings with the client and <br /> their stakeholders as needed. We will propose that several of these meetings occur in Smith Sinnett <br /> Architecture's office. Additionally, we will meet with the county commissioners at the end of each <br /> phase for their approval prior to commencing the next phase. We will also meet with the Town of <br /> Chapel Hill as needed to achieve all necessary approvals. We will provide professional cost <br /> estimating at the conclusion of the design development and construction document phase in order to <br /> stay within budget throughout the life of the project. This cost, along with all engineering fees is <br /> included within our overall fee. <br /> Phase 2 will commence as soon as the Phase 1 construction begins. Smith Sinnett Architecture will <br /> work with and coordinate all members of the design team to evaluate the owner's master plan and <br /> begin developing an approach to design and construction of the proposed improvements that will <br /> minimize impact to the function of the existing campus. During the programming phase, Smith Sinnett <br /> will meet with designated owner stakeholders to fine tune our understanding of space needs and the <br /> eventual build out of the Health Center additions and renovation. After these conversations, we will <br /> develop a program and a preliminary budget. Initially, we expect to meet with the Town of Chapel Hill <br /> Planning Department to assess and meet all requirements for approvals. If necessary for the second <br /> phase of the schematic design work, we would anticipate attending several meetings with the owner to <br /> 400 I......alke Boone "Frail!, Suite 205 Ralieliglh, INC 2 607 010.751.8552 HUB Certified <br /> WWW.sIrnlit,IhslinIrnet:t.00Irn <br />
The URL can be used to link to this page
Your browser does not support the video tag.