Browse
Search
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 1:48:04 PM
Creation date
12/11/2017 7:12:46 AM
Metadata
Fields
Template:
Contract
Date
11/1/2017
Contract Starting Date
11/1/2017
Contract Document Type
Agreement - Consulting
Agenda Item
11/2/2017
Amount
$889,540.00
Document Relationships
2019-518-E AMS - Smith Sinnett Architecture Southern Campus contract amendment 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2017-635-E AMS - Smith Sinnett Architecture PA for Southern Campus design and construction administrative services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:73052F1A-1733-4B2A-9DAD-7AA401292D5B <br /> srY w m 111111 I1III{III IIIr */ry�IIIkIII )IIII{ II <br /> 11.,1 ud Ilpll"Illllpllnllll�ll, <br /> ARCHI ..mm.. IL.\ 1 URI <br /> October 2, 2017 <br /> Orange County <br /> 200 South Cameron Street <br /> Hillsborough, North Carolina 27278 <br /> Attn.: Mr. Jeff Thompson <br /> Director of Asset Management Services <br /> Dear Mr. Thompson: <br /> FEE PROPOSAL: Orange County Southern Campus Expansion <br /> Smith Sinnett Architecture greatly appreciates the opportunity to provide Orange County with a <br /> proposal for Architectural Design & Engineering Services for the Orange County Southern Campus <br /> Expansion. <br /> SCOPE OF WORK: <br /> The project consists of two phases. The first phase will include the following: a master plan for a future <br /> 12,000 square foot addition to the Seymour Center. The initial portion will be an approximately 2500 <br /> square feet addition. Additional work will include reworking the front entry sidewalk into an accessible <br /> entry area, the creation of a new canopy and the parking lot will be reconfigured for improved <br /> bus/vehicle drop off. The site work will include the relocation of the existing storm water pond located <br /> near the entrance driveway, the realignment of the entrance roadway to remove some of the curvature, <br /> the expansion of the existing parking lot supporting the Seymour Center and the extension of a 10'wide <br /> multi-purpose pathway from the Inter-Faith Council Project Home Start driveway to the eastern parcel <br /> property line. <br /> It is anticipated as a part of the overall design process, that we will hold meetings with the client and <br /> their stakeholders as needed. We will propose that several of these meetings occur in Smith Sinnett's <br /> office. Additionally, we will meet with the county commissioners at the end of each phase for their <br /> approval prior to commencing the next phase. We will also meet with the Town of Chapel Hill as needed <br /> to achieve all necessary approvals. We will provide professional cost estimating at the conclusion of <br /> the design development and construction document phase in order to stay within budget throughout <br /> the life of the project. This cost, along with all engineering fees is included within our overall fee. <br /> We anticipate that the design team and the owner will work creatively to insure best practices, <br /> efficiencies and cost adherence in the proposed scope of each project. We will discuss possibilities for <br /> altering the timing of the separate scopes should it be deemed more cost effective to provide all of the <br /> site/civil work in the first phase and all of the building portions of the project into the second phase. <br /> Programming/Schematic Design (Phase 1): <br /> Smith Sinnett Architecture will work with and coordinate all members of the design team to evaluate <br /> the owner's master plan and begin developing an approach to design and construction of the proposed <br /> improvements that will minimize impact to the function of the existing campus. During the <br /> 4600 II.....alke Boone Tlralill, Suite 205 Ralleliglh, INC 27607 010.781.8582 HUB Certified <br /> www.sImlithslinIrnett.coIrnn <br />
The URL can be used to link to this page
Your browser does not support the video tag.