Browse
Search
Agenda - 12-12-2017 - 6-e - Consideration of Approval of Additional Station for the Durham-Orange Light Rail Transit Project at Blackwell and Mangum Streets in Downtown Durham
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 12-12-2017 - Regular Mtg.
>
Agenda - 12-12-2017 - 6-e - Consideration of Approval of Additional Station for the Durham-Orange Light Rail Transit Project at Blackwell and Mangum Streets in Downtown Durham
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 7:19:05 AM
Creation date
12/8/2017 8:01:26 AM
Metadata
Fields
Template:
BOCC
Date
12/12/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6e
Document Relationships
Minutes 12-12-2017
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> savings, but it allows sufficient room for the system to navigate between historic buildings in the <br /> downtown Durham area, making the Blackwell/Mangum station technically feasible. <br /> The addition of the Blackwell/Mangum station is expected to yield a net gain of approximately <br /> 600 trips per day according to GoTriangle's regional ridership modeling. The new station is <br /> expected to cost approximately $2.5 million which is less than the estimated $8 million to shift <br /> the Gateway station to the west. The new station costs less because it does not require any <br /> changes to the rail alignment. The proposed Gateway update requires the addition of track and <br /> a shift in the rail alignment while the new Blackwell/Mangum station is positioned along the <br /> current rail alignment. GoTriangle staff report that the new station will add approximately <br /> $150,000 in annual operations and maintenance costs and add less than a minute to end to end <br /> travel time. <br /> If the Blackwell/Mangum station is approved, it will be submitted for reevaluation by the Federal <br /> Transit Administration (FTA) in January. If the FTA requires additional environmental analysis, <br /> GoTriangle will complete that process prior to an amended Record of Decision from the FTA, <br /> which is anticipated to be completed by the fall of 2019. <br /> FINANCIAL IMPACT: There is no additional cost associated with this consideration. The <br /> addition of the Blackwell/Mangum station to the Durham-Orange Light Rail Transit project must <br /> be accommodated within the current project budget. <br /> SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable <br /> to this agenda item: <br /> • GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND <br /> INEQUITY <br /> The fair treatment and meaningful involvement of all people regardless of race or color; <br /> religious or philosophical beliefs; sex, gender or sexual orientation; national origin or <br /> ethnic background; age; military service; disability; and familial, residential or economic <br /> status. <br /> • GOAL: ENSURE ECONOMIC SELF-SUFFICIENCY <br /> The creation and preservation of infrastructure, policies, programs and funding necessary <br /> for residents to provide shelter, food, clothing and medical care for themselves and their <br /> dependents. <br /> Public Transportation provides opportunity for access to jobs and services to many individuals. <br /> RECOMMENDATION(S): The Manager recommends the Board consider approving the <br /> addition of a light rail station at Blackwell and Mangum streets in downtown Durham. <br />
The URL can be used to link to this page
Your browser does not support the video tag.