Browse
Search
Agenda - 12-12-2017-12-4 - Information Item - Memorandum - Mountains to Sea Trail (MST) – Petition and Next Steps
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 12-12-2017 - Regular Mtg.
>
Agenda - 12-12-2017-12-4 - Information Item - Memorandum - Mountains to Sea Trail (MST) – Petition and Next Steps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 8:00:50 AM
Creation date
12/8/2017 8:00:15 AM
Metadata
Fields
Template:
BOCC
Date
12/12/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
12-4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> MST Proposed Route OMSNA to Seven Mile <br /> ...... ...... Proposed Mountains-to-Sea Trail(Segment 11)-OCOoneea.heeMtn.Natural Area to Seven Mlle Creek Preserve 0,.t ii jl .__. ...... <br /> 11 l <br /> II ,, <br /> � �J , � l � q <br /> r( i - gi d1 ` �� " {,_Le4 }�P� � . � ` ? �4 , ,i r, i " � f � �■ 1 0"" ^- 44 I 1, ,, ,ca ) N 'c� <br /> , it:c..,1L-2;.°0,4'. "c \. I' 7,„,,I.,,,.,,,„,,,t., <br /> i <br /> v t r z <br /> r� <br /> i <br /> P, <br /> ..S .', <br /> I (A <br /> () <br /> * 1 F/ m ('4,A,(,)p ua ess d 4 u ,t � )"A, u I � —''''cr"wu o � , <br /> � 'err r ' <br /> ` �r <br /> � { ( prr tf/I �ly .�t „ rYA a pppe ;. <br /> y ll, <br /> i 0 <br /> eJ <br /> or <br /> _. .. 1.1 J L 1 1 � <br /> a) Discussion with NCDOT District Engineer and County Transportation <br /> Planners on the planned traverse of the 1-40/1-85 bridge on Dimmocks Mill <br /> Road, including safety, signage and other issues. <br /> b) Discussion with NC State Parks about the connections to the OMSNA trail <br /> network. <br /> c) Discussion with the Town of Hillsborough on the planned timetable for the <br /> connection of the Town's Riverwalk to OMSNA. <br /> d) Discussions with the Friends of the Mountains to Sea Trail about a <br /> Memorandum of Agreement on coordinated trail construction. <br /> e) A signage plan for Phase 11.1 to determine the type and location of <br /> needed signs, and a trail perspective showing the topographic and <br /> physical nature of the trail alignment. <br /> f) A site plan for the trailhead/waystation at Seven Mile Creek preserve, <br /> consistent with constructed trails and already-underway parking area at <br /> the preserve, which includes planned amenities. <br /> g) An assessment of any trail augmentation, such as bridges or boardwalk <br /> that may be needed. <br /> h) An Emergency Action Plan, as required, for this section of the trail; and <br /> Staff has already been in contact with the agencies and groups involved in items <br /> b), c) and d). <br /> Staff met last week with the Friends of the MST and we are working to coordinate <br /> future trail construction that will incorporate the Friends extensive group of trail- <br />
The URL can be used to link to this page
Your browser does not support the video tag.