Orange County NC Website
14. Any special provisions or specifications as to the performance of the work or the method of 6 <br /> construction that may be required by the Department must be shown on a separate sheet <br /> attached to encroachment agreement provided that such information cannot be shown on <br /> plans or drawings. <br /> 15. The Department's Division Engineer should be given notice by the applicant prior to actual <br /> starting of installation included in this agreement. <br /> 16. Method of handling traffic during construction where applicable. <br /> 17. Scale of plans, north arrow, etc. <br />