Orange County NC Website
Page 5 of 25 <br /> 4 <br /> In their comments on the Draft Environmental Impact Statement(DEIS), both the City of Durham <br /> and the Durham County Board of Commissioners requested that GoTriangle carefully evaluate <br /> the feasibility of a City Center Station between Blackwell and Mangum Streets along Pettigrew <br /> Street during the project's Engineering Phase. In response to these comments, in the Combined <br /> FEIS/ROD, GoTriangle committed to continuing its work with Durham to evaluate the feasibility <br /> of a City Center Station during the Engineering Phase. With a reduction in platform length made <br /> possible by a move to two-car platforms, GoTriangle determined that a station platform could <br /> feasibly fit between Blackwell and Mangum Streets. As a result of reducing the platform length, <br /> the area between Blackwell and Mangum streets could accommodate a station platform without <br /> resulting in a potential impact on the Bull Durham building. <br /> The purpose of the proposed Blackwell/Mangum Street Station is to offer more direct access to <br /> the city center of downtown Durham and event-based destinations in and around the American <br /> Tobacco campus, including the Durham Performing Arts Center and Durham Bulls Athletic Park. <br /> If the four boards approve this refinement, GoTriangle staff will submit an environmental re- <br /> evaluation to the FTA to compare the environmental effects of the proposed refinement to the <br /> effects previously disclosed in the Draft Environmental Impact Statement (DEIS) and determine <br /> if the commitments outlined in the Amended Record of Decision mitigate the effects. FTA will <br /> then determine if additional environmental documentation is needed (e.g., NCCU Supplemental <br /> Environmental Assessment) or if the existing environmental documentation is sufficient. <br /> Financial Impact <br /> The cost estimate for the proposed change is approximately $2.5 million Year of Expenditure <br /> (YOE) more than the baseline design. <br /> As part of FTA-required cost management practices, changes to the base cost estimate (both <br /> savings and increases) associated with changes in the project design are tracked throughout <br /> Engineering and considered together. Although the overall project budget is set at entry into <br /> Engineering at $2.476 billion, it is typical to shift expenditures between FTA cost categories to <br /> meet the needs of the project. In other words, savings in one area can cover additional <br /> expenditures in another area.This allows the agency and the project team to use the final design <br /> process to better align spending with goals and values. <br /> Attachments <br /> • Map showing the proposed location for the Blackwell/Mangum Street Station. <br /> Staff Contact <br /> • Danny Rogers, 919-485-7579, e r; g !r` C° g; l;pia!r,igl! ; !rg, <br /> /rrr <br /> WW <br /> 114111111,1111I111111111111111111111I1d1111111111111111111111111111111I1111111111,11,11,111,1,11,111 , j , , <br />