Orange County NC Website
9 <br /> James Barrett said there are two projects, two with bids, and if the School Board does <br /> not execute on these bids by 12/16 then the bids expire. He said if they go out for bids again, <br /> costs will be higher. He said time is of the essence for the Lincoln Center project. <br /> Chair Dorosin asked if CHCCS could just do the Pre-K project, and leave off the <br /> Phoenix Center and the Administration center at Lincoln Center. <br /> Todd LoFrese said scaling back projects with the contractor may result in not getting <br /> the dollar for dollar give back. He said the larger issue is that the Lincoln Center building <br /> needs to be deconstructed to provide available space for parking, egresses in and out of the <br /> site, and playground areas. He said the project does not facilitate leaving the Lincoln Center <br /> Building in place. <br /> Chair Dorosin said he understands the parameters, but asked if the December 26 <br /> deadline only allows for the plan as it currently exists; can changes be made; or would entirely <br /> new bids be required. <br /> Todd LoFrese said CHCCS could negotiate this with the contractor. He said renting <br /> space for administration would require 30,000 square feet x $20/foot = $600,000, etc. <br /> Commissioner Rich said the project came in 40% over budget, and asked if the project <br /> can be redesigned to live more within their means. <br /> Todd LoFrese said a re-design would be costly and time consuming, and waste the <br /> efforts made to this point. He said construction costs will only continue to increase, and <br /> redesign is not a viable option or close to their vision. <br /> Commissioner Marcoplos asked if anything is known about the rate of increased costs. <br /> Todd LoFrese said there are a variety of issues: slow labor market, disasters <br /> elsewhere attracting contractors, etc. <br /> Commissioner Jacobs asked to return to the following slide: <br /> District Funding Assistance <br /> 2016-17 Unassigned Fund Balance $7,180,587 <br /> Reduction for Capital Projects $3,500,000 <br /> Balance of Unassigned Fund Balance (5.03%) $3,680,587 <br /> CIP Additional 5 year funding $2,400,000 <br /> Recurring Capital Fund Balance: <br /> 2016-17 Unassigned Fund Balance $976,000 <br /> 2017-18 Unobligated Balance of Non-recurring $1.2M $700,000 <br /> Fund 6 Cash Balances (unobligated): $400,000 <br /> GRAND TOTAL FOR CAPITAL PROJECTS $7,976,000 <br /> Commissioner Jacobs referred to the unassigned fund balance, and asked if this <br /> includes the fund balance that CHCCS are required to hold, according to its agreement with <br /> Orange County. <br /> Todd LoFrese said the target is 5.5%, so this number is below target at 5.03%. <br /> Commissioner Jacobs asked if the CIP Additional 5 year Funding could be clarified. <br /> Todd LoFrese said the Board of County Commissioners made a change to bond <br /> distribution from $125 million to $120 million for schools, and the County committed to dividing <br /> $1 million between the two school systems for 5 years. He said one year has been spent on <br /> design, and there has been discussion with Orange County Schools (OCS) on a joint <br /> transportation center, which is likely further out in OCS's timing plan and ultimately too costly. <br />