Browse
Search
Minutes 11-14-2017
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2017
>
Minutes 11-14-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 7:05:17 AM
Creation date
12/6/2017 7:02:14 AM
Metadata
Fields
Template:
BOCC
Date
11/14/2017
Meeting Type
Public Hearing
Document Type
Minutes
Document Relationships
Agenda - 11-14-2017 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 11-14-2017 - QPH
Agenda - 11-14-2017 - D.1 - Zoning Atlas Amendment: Conditional Zoning —Master Plan Development
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 11-14-2017 - QPH
Agenda - 11-14-2017 - D.2 - Unified Development Ordinance (UDO) and Zoning Atlas Amendments – Flood
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 11-14-2017 - QPH
Agenda - 11-14-2017 - D.3 - Unified Development Ordinance (UDO) Amendments - Revisions to the Public Hearing Process
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 11-14-2017 - QPH
ORD-2017-023 Ordinance amending the Orange County Zoning Atlas - Settler's Point
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2017
ORD-2017-024 Ordinance amending the Zoning Atlas by eliminating the Special Flood Hazard Area (SFHA) Overlay District as currently depicted on the atlas encumbering the identified parcels of property
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2017
ORD-2017-025 Ordinance adopting amendments to its UDO to make desired revisions to the existing public hearing process for review of UDO, Comprehensive Plan, and Zoning Atlas-related items
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2017
ORD-2017-026 Ordinance adopting a new Flood Insurance Study (FIS) and new Flood Insurance Rate Maps (FIRMs) as produced by the State of NC and FEMA
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> • 10 parcels of property, <br /> • 195 acres of land south of Interstate 40, <br /> • FUTURE LAND USE DESIGNATION: Economic Development Transition, <br /> • GROWTH MANAGEMENT SYSTEM: Urban Designated <br /> Orange County/Town of Hillsborough Joint Planning Land Use Plan Designates the area: <br /> • Employment: Light/ general industrial, office, research/development, support services <br /> uses including restaurants, retail, etc. <br /> • Neighborhood: Retail (goods and services), high density residential, etc. <br /> • Suburban Office: Office /employment (do not necessarily rely on walk-in customers), <br /> etc. <br /> DEVELOPMENT DISTRICT(S): <br /> • District 1 - Industrial/Manufacturing and Research, <br /> • Located west of Old NC 86 and south of Interstate 40 , <br /> • Accessed via an existing road named Service Road <br /> • Intended to provide for light industrial/manufacturing and research operations. <br /> • Properties comprising district are Located in an Economic Development Transition land <br /> use category. <br /> • District 2 - Commercial, <br /> • Located east of Old NC Highway 86 and south of Interstate 40, <br /> • Accessed via Old NC Highway 86, <br /> • Intended to provide for light office, retail, service operations (i.e. hotel, restaurant, etc.) <br /> • Properties comprising district are located in an Economic Development Transition land <br /> use category. <br /> Conditions: <br /> • Applicant has recommended the imposition of several conditions controlling development <br /> within project; <br /> • Must be mutually agreed to by Applicant and Elected officials (as previously detailed). <br /> • Staff and Planning Board have recommended imposition of additional conditions on the <br /> project. <br /> o NOTE: Applicant has agreed to majority of conditions. Has identified <br /> some concerns and requested modification. Refer to Attachment 5. <br /> Conditions — Examples: <br /> • Approval of the Project does not constitute a guarantee utility services (i.e. water and <br /> sewer) shall be provided and/or extended by the Town of Hillsborough. <br /> • UTILITIES: <br /> o Comply with Section 6.20 of the UDO, <br /> o Development within the Project shall only be served by public water and <br /> sewer, <br /> o Utility connection(s) shall comply with applicable Town of Hillsborough <br /> standards. <br /> o Extension of utilities to District 2 shall be reviewed and approved by the <br /> Town of Hillsborough prior to development. <br /> • Site Plan(s) <br /> o Site Plan Review per Section 2.5 of the UDO required for all projects, <br /> o All submittals will require completion of an Environmental Assessment and <br /> a Transportation Impact Analysis (TIA), <br /> o All submittals required to document existing and proposed impervious <br /> surface area as well as building/open space ratios within the Project. <br /> o Documentation denoting anticipated daily water and sewer needs for <br /> proposed land uses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.