Orange County NC Website
22 <br /> 1 On October 3, 2017 the BOCC endorsed the Orange Unified Transportation Board (OUTBoard) <br /> 2 comments on the Alternatives Analysis and submitted to the DCHC MPO Board. The MPO <br /> 3 included these comments along with others and drafted the Preferred Option. The MPO <br /> 4 Technical Committee released the 2045 MTP Preferred Option for a 42-day public comment <br /> 5 period on October 25, 2017. The MPO Board also conducted a public hearing on the preferred <br /> 6 option on November 8, 2017. <br /> 7 <br /> 8 The preferred option is a 35 page document (Attachment 4). Orange County Transportation <br /> 9 Planning Staff has reviewed the Preferred Option and has provided Attachment 2 as a <br /> 10 summary of key Orange County information. 1 The OUTBoard provided the following <br /> 11 comments (Attachment 3) at its November 15 meeting: 1. The LRT extension from Chapel Hill <br /> 12 to Carrboro would better be served if it went along Main Street and into downtown rather than <br /> 13 Cameron Avenue. 2. We would like to see a bike and pedestrian path between Hillsborough <br /> 14 and Carrboro. 3. Hillsborough station is great and should be used often. Amtrak may provide <br /> 15 only two stops a day so it will need to be planned for more frequent use. Next Steps • <br /> 16 December 13 — DCHC MPO Board to approve the Preferred Option and release full 2045 MTP <br /> 17 report and final Goals/Objectives/Targeted Performance Measures for public comment. • <br /> 18 January 10 — DCHC MPO Board to adopt by resolution the 2045 MTP and report. <br /> 19 <br /> 20 Nishith Trivedi, Transportation Planner, made the following PowerPoint presentation: <br /> 21 <br /> 22 2045 Metropolitan Transportation Plan Preferred Option <br /> 23 11/20/2017 <br /> 24 <br /> 25 Outline <br /> 26 ❖ Background <br /> 27 o DCHC MPO role and responsibility <br /> 28 o 2045 MTP Process <br /> 29 ❖ Key Aspects of 2045 MTP Preferred Option <br /> 30 o Goals and Objectives <br /> 31 o AIM High Model Results <br /> 32 o Projects <br /> 33 o Financial Plan <br /> 34 ❖ Conclusion <br /> 35 o DCHC MPO 2045 MTP Update Schedule <br /> 36 ❖ Managers Recommendations <br /> 37 <br /> 38 Background <br /> 39 <br /> 40 DCHC MPO Role and Responsibility <br /> 41 Durham-Chapel Hill Carrboro <br /> 42 Metropolitan Planning Organization <br /> 43 • Responsible for long range transportation planning in <br /> 44 o Durham City and County, and <br /> 45 o Parts of Orange County and Chatham County. <br /> 46 • Federal mandate— MPO must plan and approve use of federal transportation funding <br /> 47 • Policy Board -- Composed mostly of local elected officials from member jurisdictions and <br /> 48 counties. <br /> 49 What is the 2045 MTP Process <br /> 50 Durham-Chapel Hill Carrboro <br />