Orange County NC Website
10 <br /> 1 Commissioner Rich said everyone is thinking about capacity, but this is an enormous <br /> 2 amount of money to try and make up. <br /> 3 Commissioner Price said the abstract mentions $5 million to reimburse CHCCS for its <br /> 4 design expenditures. She asked if this money has been used. <br /> 5 Todd LoFrese said this money will be completely used up by the time the Chapel Hill <br /> 6 High School (CHHS) project goes out to bid in March. <br /> 7 Commissioner Price asked if the remaining amount is reflected on the slide. <br /> 8 Todd LoFrese said he would have to get the exact numbers for the BOCC. <br /> 9 Commissioner Price asked if the rest of the funds would be used up if CHCSS had to re- <br /> 10 design. <br /> 11 Todd LoFrese said yes and possibly more. <br /> 12 Commissioner McKee said Pre-K holds a special place in his heart, but he does not <br /> 13 know how both of these projects can move forward. He said because the Lincoln Center came <br /> 14 in over budget, he would expect the same of CHHS. He said completing one project at the over <br /> 15 budgeted prices cripples the other project. He senses a preference for moving ahead with <br /> 16 Lincoln, but he is unsure if this is wise before knowing the bids for CHHS, and having no plan B. <br /> 17 He said CHHS has some serious needs. <br /> 18 Commissioner Burroughs said she looked at the 20th day numbers, and the elementary <br /> 19 level has not grown for the last two to three years. She said birth rates are also remaining at <br /> 20 unusually low levels. She said she is now unsure that capacity is as big of a need as she once <br /> 21 thought. <br /> 22 Commissioner Burroughs said Orange County does not have additional debt capacity, <br /> 23 and no impact fees. She said this breaks her heart, but the County does not have any extra <br /> 24 funding. She said CHCCS needs to look at its population growth, and there is no source of <br /> 25 money at this time from Orange County without a major change in Raleigh. <br /> 26 James Barrett said population growth is not the driver of reaching SAPFO in 2020, but <br /> 27 rather it is the state-mandated changes in class size. He said it is not that there will be more <br /> 28 children, but that less children will be able to go in each classroom, and thus more classrooms <br /> 29 will be needed to meet the legislative mandate. <br /> 30 Commissioner Burroughs said on the face of it that is the problem. She said pressure <br /> 31 needs to be put on the General Assembly about the classroom issue, but regardless of that the <br /> 32 County still does not have additional funds. <br /> 33 Chair Dorosin said building more schools in not the only choice. He said Wake County <br /> 34 is considering making larger classes in 4th and 5th grades. <br /> 35 Commissioner Jacobs said this is an opportunity to change the way they look at these <br /> 36 projects and how they are planned. He said coming in at the eleventh hour and 55th minute is a <br /> 37 little late. He said they should have all been working together on this from the beginning as no <br /> 38 one entity has all the answers. He said if this is not going to work, then how flexible and <br /> 39 creative can they be with other solutions. He said not to look at the December bid as the <br /> 40 deadline, but rather to truly brainstorm. He said to him this is a chance to think differently and <br /> 41 maybe phase the Chapel Hill High project. He said to set aside their assumptions and come up <br /> 42 with some options together and forget about getting it done in 3 weeks. He said sometimes <br /> 43 one has to spend money to save money. <br /> 44 Chair Dorosin asked if the following slide would be put up, and asked if School Board <br /> 45 members had comments: <br /> 46 <br /> 47 CHCCS Requests Assistance <br /> 48 • Provide ideas and guidance for the options presented <br /> 49 • Continue to work with County Director of Asset Management Services <br />