Orange County NC Website
9 <br /> 1 Chair Dorosin said he understands the parameters, but asked if the December 26 <br /> 2 deadline only allows for the plan as it currently exists; can changes be made; or would entirely <br /> 3 new bids be required. <br /> 4 Todd LoFrese said CHCCS could negotiate this with the contractor. He said renting <br /> 5 space for administration would require 30,000 square feet x $20/foot = $600,000, etc. <br /> 6 Commissioner Rich said the project came in 40% over budget, and asked if the project <br /> 7 can be redesigned to live more within their means. <br /> 8 Todd LoFrese said a re-design would be costly and time consuming, and waste the <br /> 9 efforts made to this point. He said construction costs will only continue to increase, and <br /> 10 redesign is not a viable option or close to their vision. <br /> 11 Commissioner Marcoplos asked if anything is known about the rate of increased costs. <br /> 12 Todd LoFrese said there are a variety of issues: slow labor market, disasters elsewhere <br /> 13 attracting contractors, etc. <br /> 14 Commissioner Jacobs asked to return to the following slide: <br /> 15 <br /> 16 District Funding Assistance <br /> 17 2016-17 Unassigned Fund Balance $7,180,587 <br /> 18 Reduction for Capital Projects $3,500,000 <br /> 19 Balance of Unassigned Fund Balance (5.03%) $3,680,587 <br /> 20 CIP Additional 5 year funding $2,400,000 <br /> 21 <br /> 22 Recurring Capital Fund Balance: <br /> 23 2016-17 Unassigned Fund Balance $976,000 <br /> 24 2017-18 Unobligated Balance of Non-recurring $1.2M $700,000 <br /> 25 <br /> 26 Fund 6 Cash Balances (unobligated): $400,000 <br /> 27 GRAND TOTAL FOR CAPITAL PROJECTS $7,976,000 <br /> 28 <br /> 29 Commissioner Jacobs referred to the unassigned fund balance, and asked if this <br /> 30 includes the fund balance that CHCCS are required to hold, according to its agreement with <br /> 31 Orange County. <br /> 32 Todd LoFrese said the target is 5.5%, so this number is below target at 5.03%. <br /> 33 Commissioner Jacobs asked if the CIP Additional 5 year Funding could be clarified. <br /> 34 Todd LoFrese said the Board of County Commissioners made a change to bond <br /> 35 distribution from $125 million to $120 million for schools, and the County committed to dividing <br /> 36 $1 million between the two school systems for 5 years. He said one year has been spent on <br /> 37 design, and there has been discussion with Orange County Schools (OCS) on a joint <br /> 38 transportation center, which is likely further out in OCS's timing plan and ultimately too costly. <br /> 39 He said the remaining 4 years of that distribution would be earmarked and steered towards the <br /> 40 capital needs. <br /> 41 Commissioner Jacobs asked if CHCCS would do that over the next 4 years. <br /> 42 Todd LoFrese said yes. <br /> 43 Commissioner Rich referred to value engineering, and asked if it was possible to value <br /> 44 engineer one's way out of a project that is 40% over budget. She referred to the Eubanks Road <br /> 45 recycling project, which had to go back to the drawing board due to being over budget. She <br /> 46 said it was revised and completed in a manner in which the County could stay within its means. <br /> 47 She said this likely needs to happen with this project. <br /> 48 Todd LoFrese said reducing the Lincoln center by $10 million would lop off a huge piece <br /> 49 of the project, which would result in the project being scrapped and needing to start over. He <br /> 50 said the pre-K project addresses the issue of capacity. <br />