Orange County NC Website
6 <br /> 1 <br /> 2 Chapel Hill High School Building Replacements (photographs) <br /> 3 <br /> 4 Chapel Hill High Renovations (photographs) <br /> 5 <br /> 6 Progress thus far <br /> 7 • Lincoln Center <br /> 8 0 Designed and bid <br /> 9 0 Bids were $10 million over budget <br /> 10 • CHHS <br /> 11 0 Design underway <br /> 12 0 March 2018 target special use permit <br /> 13 0 March/April 2018 project bidding <br /> 14 <br /> 15 DPI Cost of School Projects <br /> 16 Analysis of 19 schools built in Triangle area from 2013 through 2017: <br /> 17 2013 average cost per sf - $ 156.18 <br /> 18 2017 average cost per sf - $ 248.18 <br /> 19 (through March) <br /> 20 59% increase <br /> 21 <br /> 22 Lincoln Center Campus <br /> 23 Proiect Budget Post Bid Proiect Cost <br /> 24 Construction 24,248,072 34,471,900 <br /> 25 Professional Fees 1,900,000 1,900,000 <br /> 26 Furniture/Equip. 1,000,000 1,000,000 <br /> 27 Contingency (2%) 493,054 (3.5%) 1,142,000 <br /> 28 PROJECT TOTAL $28,045,746 $38,513,900 <br /> 29 <br /> 30 Chapel Hill High School <br /> 31 <br /> 32 Budget Revised Estimate <br /> 33 New Construction 34,220,000 = 217sf 45,504,000 = 288 sf <br /> 34 Renovation 5,280,000 = 55 sf 9,120,000 = 95 sf <br /> 35 Sub-total 39,500,000 54,624,000 <br /> 36 <br /> 37 Professional Fees 3,950,000 3,950,000 <br /> 38 Furniture/Equip. 2,150,000 2,150,000 <br /> 39 Technology (est.) 1,000,000 1,000,000 <br /> 40 Contingency (3.5%) 1,400,000 1,900,000 <br /> 41 <br /> 42 PROJECT TOTAL 48,000,000 63,624,000 <br /> 43 <br /> 44 District Funding Assistance <br /> 45 2016-17 Unassigned Fund Balance $7,180,587 <br /> 46 Reduction for Capital Projects $3,500,000 <br /> 47 Balance of Unassigned Fund Balance (5.03%) $3,680,587 <br /> 48 CIP Additional 5 year funding $2,400,000 <br /> 49 <br /> 50 Recurring Capital Fund Balance: <br />