Browse
Search
Agenda - 11-20-2017 - 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 11-20-2017 - Regular Mtg.
>
Agenda - 11-20-2017 - 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 3:45:39 PM
Creation date
11/17/2017 6:30:43 AM
Metadata
Fields
Template:
BOCC
Date
11/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 11-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> <br /> 1 <br />Key Points 2 <br />• Project Phasing 3 <br />– “Not to Exceed” Service Agreement 4 <br />– Phase 1: Design (Southern Human Service Center, Seymour Center, Campus 5 <br />Site) 6 <br />• Agenda Abstract Page 2 7 <br />– Phase 1: Construction (Seymour Center, Camus Site) 8 <br />• Agenda Abstract Page 2 9 <br />– Phase 2: Construction (Southern Human Services Center) 10 <br />• Attachment 2 Page 3 11 <br />– All Design/Professional Services has been appropriated 12 <br />– Phase 2 Construction is contemplated for construction in year 3 (2019/20) 13 <br /> 14 <br />Existing Southern Campus Illustrative (aerial photograph) 15 <br /> 16 <br />Attachment A: Project Overview Illustrative 17 <br /> 18 <br />Rhonda Angerio, President of Smith Sinnet, continued the PowerPoint presentation: 19 <br /> 20 <br />Who We Are 21 <br /> 22 <br />Our History 23 <br /> 24 <br />Working With Orange County 25 <br /> 26 <br /> Angel Barnes resumed the presentation: 27 <br /> 28 <br />Purpose 29 <br />• Requesting for the Orange County Board of County Commissioners to approve entering 30 <br />into a Professional Services Agreement with Smith Sinnett Architecture of Raleigh, NC 31 <br />for the design and construction administration of the Southern Campus Expansion 32 <br />capital project upon final review of the County Attorney; and 33 <br />• Authorize the Manager to execute the Agreement and any subsequent design 34 <br />amendments for contingent and unforeseen design requirements on behalf of the 35 <br />Board. 36 <br /> 37 <br />Commissioner Rich said the BOCC aims to pay all County employees a living wage, and 38 <br />she hopes that Smith Sinnet would do the same, as well as be inclusive and non-discriminating. 39 <br />Commissioner Price asked if the slope of the road will be too steep for some to climb. 40 <br />Rhonda Angerio said this will be managed with the civil engineers and landscape 41 <br />architects to insure code compliance and accessibility. 42 <br /> 43 <br />A motion was made by Commissioner Price, seconded by Commissioner Rich for the 44 <br />Board to: 45 <br />1) Approve entering into a Professional Services Agreement with Smith Sinnett Architecture 46 <br />of Raleigh, NC for the design and construction administration of the Southern Campus 47 <br />Expansion capital project upon final review of the County Attorney; and 48 <br />2) Authorize the Manager to execute the initial Agreement and any subsequent design 49 <br />amendments for contingent and unforeseen design requirements on behalf of the Board. 50
The URL can be used to link to this page
Your browser does not support the video tag.