Browse
Search
Agenda - 11-20-2017 - 7-a - GoTriangle Update on Transit Oriented Development Process and Potential Rail Station Changes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 11-20-2017 - Regular Mtg.
>
Agenda - 11-20-2017 - 7-a - GoTriangle Update on Transit Oriented Development Process and Potential Rail Station Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 3:45:32 PM
Creation date
11/17/2017 6:30:42 AM
Metadata
Fields
Template:
BOCC
Date
11/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
Document Relationships
Minutes 11-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IntheircommentsontheDraftEnvironmentalImpactStatement(DEIS),boththeCityofDurham <br />andtheDurhamCountyBoardofCommissionersrequestedthatGoTrianglecarefullyevaluate <br />thefeasibilityofaCityCenterStationbetweenBlackwellandMangumStreetsalongPettigrew <br />Streetduringtheproject’sEngineeringPhase.Inresponsetothesecomments,intheCombined <br />FEIS/ROD,GoTrianglecommittedtocontinuingitsworkwithDurhamtoevaluatethefeasibility <br />ofaCityCenterStationduringtheEngineeringPhase.Withareductioninplatformlengthmade <br />possiblebyamovetotwoͲcarplatforms,GoTriangledeterminedthatastationplatformcould <br />feasiblyfitbetweenBlackwellandMangumStreets.Asaresultofreducingtheplatformlength, <br />theareabetweenBlackwellandMangumstreetscouldaccommodateastationplatformwithout <br />resultinginapotentialimpactontheBullDurhambuilding. <br /> <br />ThepurposeoftheproposedBlackwell/MangumStreetStationistooffermoredirectaccessto <br />thecitycenterofdowntownDurhamandeventͲbaseddestinationsinandaroundtheAmerican <br />Tobaccocampus,includingtheDurhamPerformingArtsCenterandDurhamBullsAthleticPark. <br /> <br />Ifthefourboardsapprovethisrefinement,GoTrianglestaffwillsubmitanenvironmentalreͲ <br />evaluationtotheFTAtocomparetheenvironmentaleffectsoftheproposedrefinementtothe <br />effectspreviouslydisclosedintheDraftEnvironmentalImpactStatement(DEIS)anddetermine <br />ifthecommitmentsoutlinedintheAmendedRecordofDecisionmitigatetheeffects.FTAwill <br />thendetermineifadditionalenvironmentaldocumentationisneeded(e.g.,NCCUSupplemental <br />EnvironmentalAssessment)oriftheexistingenvironmentaldocumentationissufficient. <br /> <br />FinancialImpact <br />Thecostestimatefortheproposedchangeisapproximately$2.5millionYearofExpenditure <br />(YOE)morethanthebaselinedesign. <br /> <br />AspartofFTAͲrequiredcostmanagementpractices,changestothebasecostestimate(both <br />savingsandincreases)associatedwithchangesintheprojectdesignaretrackedthroughout <br />Engineeringandconsideredtogether.Althoughtheoverallprojectbudgetissetatentryinto <br />Engineeringat$2.476billion,itistypicaltoshiftexpendituresbetweenFTAcostcategoriesto <br />meettheneedsoftheproject.Inotherwords,savingsinoneareacancoveradditional <br />expendituresinanotherarea.Thisallowstheagencyandtheprojectteamtousethefinaldesign <br />processtobetteralignspendingwithgoalsandvalues. <br /> <br />Attachments <br />x MapshowingtheproposedlocationfortheBlackwell/MangumStreetStation. <br /> <br />StaffContact <br />x DannyRogers,919Ͳ485Ͳ7579,drogers@gotriangle.org <br />Page 5 of 25 <br />5
The URL can be used to link to this page
Your browser does not support the video tag.