Agenda - 11-20-2017 - 6-a - Chapel Hill-Carrboro City Schools Bond Project Update
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 11-20-2017 - Regular Mtg.
>
Agenda - 11-20-2017 - 6-a - Chapel Hill-Carrboro City Schools Bond Project Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 4:00:58 PM
Creation date
11/17/2017 6:30:31 AM
Metadata
Fields
Template:
BOCC
Date
11/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes 11-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Funding Sources <br /> Bond Proceeds 28,845,900 <br /> Fund Balances/other 5,576,000 <br /> CIP contingency 2,400,000 <br /> TOTAL $ 36,821,900 <br /> Benefits <br /> • Centralized Pre K is accomplished and its advantages realized: appropriate environment, <br /> increased opportunities for targeted interventions, improved access for exceptional <br /> children, improved occasions for staff development and coaching, better support for new <br /> teachers. <br /> • Provides the most immediate increase in elementary school capacity— 189 permanent <br /> seats plus the repurpose of 8 mobile units. This positions the district to better meet the <br /> needs for class size reductions and/or student growth. <br /> • Expansion of Phoenix Academy is achieved and high school capacity is increased by 90 <br /> seats. <br /> • The district's investment in the project is safeguarded. <br /> • Proceeding now avoids re-bidding the project. <br /> Challenges <br /> • Remaining $44.2 million Bond proceeds for Chapel Hill High School. <br /> • Potential exists for major revisions and decreased scope of work to CHHS project. <br /> • Begin discussions to identify additional funding for CHHS. <br /> Option 2 —Defer decisions until CHHS construction bids are opened in March/April 2018. <br /> Benefits <br /> • Waiting provides certainty regarding the cost of the two projects. <br /> • Using current construction bid costs, if the total CHHS project is done with building <br /> additions and renovations, the remaining Bond funds of$9-10M could be directed to <br /> improve Lincoln Center buildings or other smaller projects. <br /> • CHHS project produces an increase in high school capacity of 105 seats. <br /> Challenges <br /> • Proceeding with only the CHHS project means the centralization of Pre K and expansion <br /> of Phoenix Academy are not realized and their resulting benefits not achieved. <br /> • Abandoning centralized Pre K halts the increase in elementary school capacity thereby <br /> eliminating possibilities to accommodate class size reductions and/or student growth. <br /> • If the Lincoln Center Campus project is re-visited in 2018, construction cost needs to be <br /> re-bid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.