Orange County NC Website
<br />5.05 Assist Owner with preparing aContrac[ with selected utility contractor. <br />6. Construction Observation/As-Built Drawings <br />6.01 Make site visits, attend project meetings, provide clarification drawings while the site <br />construction is in progress to assist [he contractor in interpreting the contract documents and to <br />ascertain the contractor's conformance with plans, and inform the Owner of any discrepancies, <br />6.02 Review project submittals and Change Orders. <br />6.03 Review contractors' applications for payment. <br />6.04 Perform substantial completion and final completion inspections. <br />6.05 Provide final certification of water and sewer conshuction as required by the State. <br />6.06 Revise drawings based on As-Built survey, and submit As-Built elevations <br />for any Water and Sewer extensions. <br />7, Additional Services not included in Basic Scope of Services, which can be performed at the <br />direction of the Owner <br />7.01 Expanded Conditional Use Permit - Expand Conditional Use Permit to include Phase 2 <br />improvements as shown on the attached map (2 additional soccer fields, 2 baseball fields, Tennis <br />Courts, basketball courts, volleyball courts, tot lot, Park base, associated parking, <br />restroom/concession building, roller hockey and associated drives, trails, storm and utilities <br />(this is not a construction or bid level package) Submitted at the same time as Phase One <br />7.01 Boundary Survey <br />7,02 Meet on-site widr Town of Carrboro/Sungate design to determine extents of jurisdictional <br />streams and stream buffer. Map locations of streams. <br />7.04 Delineate jurisdictional wetlands on the property; prepare a map showing these wetlands, file <br />with USACOE <br />Other Additional Services; <br />7.05 Construction Observation or daily inspections beyond details stipulated in 6.01 <br />7.06 Re-designs authorized by the Owner including: <br />- Re-design of the Site Plan requested by the Owner after plans are submitted to Orange <br />County for Site Plan Approval <br />- Re-design of the Site Construction Plans after Site conshuction Drawings are submitted to <br />Orange County for Site Construction Plan Approval except for city requested changes <br />7.07 Re-designs due to unknown or unanticipated field problems including, but not limited to <br />unsuitable soil and undiscovered utilities. <br />7.08 Water Feature Design <br />7.09 Field measurement of quantities of unsuitable materials <br />7.10 Laboratory testing of materials, borings, and specialized geological studies beyond those <br />services described in 1.07 above <br />7..1 I Assistance in negotiating for land and easement rights. <br />7..12 Construction documents for buildings (proposal assumes pre-engineered buildings) <br />7..13 Preparation of building elevations as may be required for the site plan <br />7.14 Traffic Impact Analysis <br />Z 15 Flood studies or FEMA permitting <br />7.16 Construction stake-out of any site features or details <br />7.17 Permit Application Fees, Site Plan Fees, Re-review Fees <br />7,18 Design of any water or sewer disposal or neatment facilities <br />7.19 Plats and easement maps <br />7.20 Off-site road improvements <br />721 Environmental assessments other than Wetlands Delineation <br />722 Wetlands/stream disturbance permitting <br />7..2.3 Surveying <br />