Orange County NC Website
<br />7.1.3 Permit Application Fees, Site Plan Fees, Re-review Fees <br />7.14 Design of any water or sewer disposal or hea[ment facilities <br />Z.I S Plats and easement maps <br />7.16 Off-site road improvements <br />7..17 Environmental assessments other than Wetlands Delineation <br />7.18 Wetlands/Stream Disturbance Permitting <br />7. I9 Surveying other ilran Wetlands Mapping <br />7..20 Flood Studies and FEMA permitting <br />7.21 Stream determination <br />B, TWIN CREEKS DISTRICT PARK <br />1. Pre-submittal Phase <br />1.01 Work with Owner and stakeholders to refine scope and general parameters of site design <br />1.02 Determine Storm Drainage and Utility Requirements <br />1,0.3 Meet with Town oYCarrboro Planning, Public Works, Sungate Engineering, Fire and <br />Inspections to determine relevant issues and approval process <br />1.04 Work with Owner to Develop Opinions of Constmction Costs <br />1.05 Conduct a Sustainability Workshop with the Owner and stakeholders <br />1.06 Delinea[ejurisdictiona) wetlands on the property, prepare a map showing these wetlands, file <br />with USACOE <br />1.07 Meet on-site with Town of Carrboro/Sungate design to determine extents of jurisdictional <br />streams and stream buffer. Map locations of streams <br />1.07 Provide Geotechnical Investigation to determine general soil conditions, depth to any bedrock <br />less than 30' deep, pavement design recommendations and buildmg footing design <br />recommendations <br />1.08 Work with Owner to select pre-engineered building type for picnic shelters <br />1.09 Mee[ with the design Consultants for the proposed new elementary school to the north, and the <br />proposed Ballentine subdivision by MI homes to the south [o coordinate locations of trails, <br />streets and utilities <br />2, Design Development/Site Plan Approval <br />2AI Prepare a detailed Site Plans for approval by the Town of Carrboro, showing all of the Phase <br />One requirements including but not limited fo the following: <br />• Conditional Use Permit Application including Plans ,calculations and support documents <br />• Existing conditions showing zoning, resource protection ordinance requirements, setbacks, <br />buffers, and any tabular site data <br />• Preliminary General Demolition Plan showing structures, pavements and known utilities <br />to be removed/relocated <br />• Preliminary layout Plan of pavements, fields, pedestrian and vehicrdar circulation, <br />sfructures and other Phase One Improvements <br />• Preliminary Grading Plan for site, including spot elevations, Storm water Study, storm <br />drainage systems layout and support calculations <br />• Preliminary Erosion Conhol Plan detailing any NCDENR requirements <br />• Preliminary Utility Plan showing plan views of water and sewer connection to existing <br />system <br />• Preliminary Civil Related Site Details as required for Site Plan Approval <br />• Any supplementary storm drainage calculations and analysis as needed for Site Plan <br />Approval <br />• Preliminary Site Lighting Plan <br />