Browse
Search
Agenda - 06-27-2006-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 06-27-2006
>
Agenda - 06-27-2006-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:59:19 PM
Creation date
8/29/2008 9:37:49 AM
Metadata
Fields
Template:
BOCC
Date
6/27/2006
Document Type
Agenda
Agenda Item
9c
Document Relationships
2006 S Purchasing - Coulter Jewell Thames Northern Park and Twin Creeks Park (Phase 1)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060627
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />4, Engineering and Regulatory Agency Approvals <br />4,01 NCDENR Erosion Confrol Permit for land disturbing operations for grading of site <br />4.02 NCDOT Driveway Permits as required for driveway modifications at NC 86 <br />4,03 Coordinate with Environmental I-Iealth for new well <br />4,04 Prepare and submit plans and documents for submittal and approval [o Orange County for <br />Site Construction Plans <br />5. Bidding and Negotiation <br />5 O1 Dishibute plans and specifications to prospective bidders for pricing, following all applicable <br />state laws that govern the formal bid process for construction contracts involved with <br />public monies.. <br />5.02 Conduct aPre-Bid Conference at a time and place selected by the Owner. <br />5.0.3 Prepare Bid Tabulations and Certification of Bid results For Owner. <br />5.04 Recommendation of Award of low, responsible, responsive bidder to the Owner <br />5,05 Assist Owner with preparing aConhact with selected utility conhactor. <br />6. Construction Observation/As-Built Drawings <br />6 O1 Make site visits, attend project meetings, provide clarification drawings while the site <br />construction is in progress to assist the contractor in interpreting the contract documents and to <br />ascertain the contractor's conformance with plans, and inform the Owner of any discrepancies. <br />6.02 Review project submittals and Change Orders. <br />6.0.3 Review contractors' applications for payment. <br />6.04 Perform substanfial completion and final completion inspections. <br />6.05 Provide final certification of water and sewer construction as required by the State. <br />6.06 Revise drawings based on As-Built survey, and submit As-Built elevations <br />for any Water and Sewer extensions. <br />7. Additional Services not included in Basic Scope of Services, which can be performed at the <br />direction of the Owner <br />7.01 Delineate jurisdictional wetlands on the property, prepare a map showing these wetlands, file <br />with USACOE <br />7.02 Construction Observation or daily inspections beyond details stipulated in 6,01 <br />7.03 Re-designs authorized by the Owner including: <br />- Re-design of the Site Plan requested by the Owner after' plans are submitted to Orange <br />County for Site Plan Approval <br />- Re-design of the Site Construction Plans after Site Construction Drawings are submitted to <br />Orange County for Site Consfruc[ion Plan Approval except for city requested changes <br />7 04 Re-designs due to unknown or unanticipated field problems including, but not limited to <br />unsuitable soil and undiscovered utilities, <br />7.05 Water Feature Design <br />7.06 Field measurement of quantities of unsuitable materials <br />7.07 Laboratory testing of materials, borings, and specialized geological studies beyond those <br />services described in 1.07 above <br />7.08 Assistance in negotiating for land and easement rights.. <br />7.09 Construction documents for buildings (proposal assumes pre-engineered buildings) <br />7.10 Preparation of building elevations as may be required for the site plan <br />7.11 Traffic Impact Analysis <br />7.12 Conshuction stake-out of any site features or details <br />
The URL can be used to link to this page
Your browser does not support the video tag.