<br />2, Design Development/Site Plan Approval <br />2.01 Prepare a detailed Site Plans for approval by the Orange County Planning and Engineering <br />departments, showing all of the Phase One requirements including but not limited to the <br />following: <br />• Existing conditions showing zoning, resource protection ordinance requirements, setbacks, <br />buffers, and any tabular site data <br />• Preliminary General Demolition Plan showing structures, pavements and known utilities <br />to be rcmoved/relocated <br />• Preliminary layout Plan of pavements, fields, pedestrian and vehicular circulation, <br />structures and other Phase One Improvements <br />• Preliminary Grading Plan for site, including spot elevations, Storm water Study, storm <br />drainage systems layout and support calculations <br />• Preliminary Erosion Control Plan detailing any NCDENR requirements <br />• Preliminary Utility Plan showing plan views of water and sewer connection to existing <br />system (System currently being designed and bid by Orange county) <br />• Preliminary Civil Related Site Details as required for Site Plan Approval <br />• Any supplementary storm drainage calculations and analysis as needed for Site Plan <br />Approval <br />• Preliminary Site Lighting Plan <br />• Preliminary Landscape Plan <br />2.02 Attend progress meetings with the Owner to coordinate site plan Drawings <br />2.0.3 Site visits as necessary to determine site conditions <br />2 04 Submit Plans to Orange County Planning Department for review and approval <br />2.05 Attend Staff Review Meetings <br />2.06 Revise Plans as necessary to receive Site Plan Approval <br />2.07 Develop Opinion of Probable Construction Costs <br />3. Construction Documentation <br />3.01 Prepare plans, specifications and support calculations suitable for approvals, pricing and <br />Construction of site elements <br />• General Demolition Plan showing structures, pavements and known utilities to be removed <br />and relocated <br />• Layout Plan showing pedestian and vehicular pavements, building locations, fields, <br />recreation areas <br />• Grading and storm drainage plan including necessary storm water BMP's <br />• Sports Fields including appurtenances, irzigation and design of water supply (well or <br />existing lake) <br />• Site Lighting <br />• Erosion Conhol Plan <br />• Water and Sewer Utility Plans including connection to existing water supply and <br />wastewater treatment facility, as well as a small sewer pump for the restrooms <br />• Vehicular and Pedestrian pavements <br />• Sitc Construction Details <br />• Specify a combination picnic shelter/restroom building with associated water/sewer/power <br />connections <br />.3,02 Prepare detailed plan/profile drawings for on-site water and sanitary sewer design.. <br />.3,0.3 Design and documentation for storm drainage piping, erosion control and other support data and <br />details suitable for bidding, approval from all regulatory agencies (NCDOT, local engineering, <br />NCDENR) and construction. <br />3 04 Compliance with all design criteria's established by local, state and federal regulatory agencies <br />3.05 Develop Opinion of Probable Conshuc[ion Costs <br />