Browse
Search
Agenda - 06-27-2006-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 06-27-2006
>
Agenda - 06-27-2006-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:59:19 PM
Creation date
8/29/2008 9:37:49 AM
Metadata
Fields
Template:
BOCC
Date
6/27/2006
Document Type
Agenda
Agenda Item
9c
Document Relationships
2006 S Purchasing - Coulter Jewell Thames Northern Park and Twin Creeks Park (Phase 1)
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060627
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />iff WE61 MAIN STREET <br />DURHAM, NORTH CAROLINA 1]]61 <br />p919 662 9]68 1919 696 5646 <br />P i s a l,. ~. i_ i h q Gulls ~~ e <br />LETTER OF PROPOSAL <br />made this 19th day of )une, 2006 <br />To The OWNER <br />Orange County Purchasing Department <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />Attn: Pamela Jones <br />By The SITE CONSULTANT <br />Coulter Jewell Thames, P..A, <br />11 I West Main Street <br />Durham, North Carolina 27701 <br />Por Landscape Architecture and Civil Engineering Services <br />On Phase One of the Northern Community Park, Cedar Grove, and Phase One of the Twin Creeks District <br />Park, Carrboro <br />Description <br />This proposal is for Landscape Architecture, Civil Engineering, Site Plan Approval, Bidding and <br />Construction Observation services related to the site work associated with Phase One of each project A <br />Project Limits Map for each location is attached to this Proposal. <br />SCOPE OF BAS[C SERVICES: <br />A. NORTRERN COMMUNITY PARK <br />1. Pre~submittal Phase <br />1.01 Work with Owner and stakeholders to refine scope and general parameters of site design <br />1.02 Determine Storm Drainage and Utility Requirements <br />1.03 Meet with Orange County Planning, Engineering, Fire and Inspections to determine relevant <br />issues and approval process <br />1.04 Work with Owner to Develop Opinions of Construction Costs <br />1.05 Conduct a Sustainability Workshop with the Owner and stakeholders <br />1.06 Delineate jurisdictional wetlands on the property, prepare a map showing these wetlands, file <br />with USACOE <br />1.07 Provide Geotechnical Investigation to determine general soil conditions, depth to any bedrock <br />less than 20' deep, pavement design recommendations and buildmg footing design <br />recommendations <br />1.08 Work with Owner to select pre-engineered building type for restroom/shelter building <br />
The URL can be used to link to this page
Your browser does not support the video tag.