Orange County NC Website
Orange County Transfer of Development Rights Feasibility Study 26 <br />DRAFT Economic Feasibility Report <br />implementation cost estimates; the proposed Evaluation measures; and to <br />receive public feedback. <br />Present public feedback findings to Planning Board and County Commission; <br />revise TDR Plan and implementation costs estimates as needed based on <br />direction from County Commission, <br />6.7.1006 <br />