Browse
Search
Agenda - 06-27-2006-7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 06-27-2006
>
Agenda - 06-27-2006-7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:00:34 PM
Creation date
8/29/2008 9:37:19 AM
Metadata
Fields
Template:
BOCC
Date
6/27/2006
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes - 20060627
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Transfer of Development Rights Feasibility Study 24 <br />DRAFT Economic Feasibility Report <br />If Orange County determiries that it wishes to proceed with developing a TDR program <br />within the guidelines established in Phases I-II of the TDR Feasibility Study, the <br />following is the recommended process for doing so: <br />1. Conduct County Commission work session(s) to identify and prioritize TDR goals <br />and objectives; <br />2. Develop a proposed TDR Plan with significant public and key agency staff <br />involvement; and <br />3. Adopt the TDR Plan with full public notice, public hearings and vote by County <br />Commission. <br />The County would then be prepared to implement the TDR Plan, including providing <br />adequate resources for both the initial launching and ongoing operation of the TDR <br />program. While the first and third steps are each critical to the successful completion of <br />the process, the majority of the Phase III work will occur in step 2 above, "Develop a <br />Proposed TDR Plan," and is outlined in more detail below. Step 2 begins with the goals <br />and objectives specified for the TDR program by the County Commission, and it ends <br />with a proposed TDR Plan ready for final public review and comment prior to a vote on <br />its adoption by the County Commissioners. The proposed TDR Plan consists of these <br />main components: <br />Goals and Objectives for the proposed TDR Program; <br />The Program Design elements of the proposed TDR Program; <br />The Administrative Design elements of the proposed TDR. Program; <br />Evaluation measures for the proposed TDR program; <br />Proposed TDR ordinance language; and <br />Estimated staffing and other resource costs associated with the launching and <br />ongoing operation of the proposed TDR program. <br />Here is the recommended process for Phase III's Step 2, "Develop a Proposed TDR <br />Plan": <br />2A. Select Program Design Options <br />Conduct an in-depth economic valuation assessment on Receiving Area design <br />options; to include more detailed information on valuation on properties and tax <br />assessment data <br />Planning Board and key departments staff work session(s) to prioritize Program <br />Design options based on compatibility with existing programs and initiatives and <br />fit with TDR goals and objectives <br />Task Force provides input into selection of Program Design options based on <br />economic feasibility results and fit with TDR goals and objectives <br />Consultants make recommendations in consultation with Planning Staff on <br />selection of Program Design options based on all of the above considerations <br />6.72006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.