Browse
Search
Agenda - 11-20-2017 - 6-d - Durham-Chapel Hill-Carrboro Metropolitan Planning Organization 2045 Metropolitan Transportation Plan Preferred Option – Public Comment Period
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 11-20-2017 - Regular Mtg.
>
Agenda - 11-20-2017 - 6-d - Durham-Chapel Hill-Carrboro Metropolitan Planning Organization 2045 Metropolitan Transportation Plan Preferred Option – Public Comment Period
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 4:17:04 PM
Creation date
11/16/2017 3:42:44 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Orange County Transit Plan also supports the increased cost of existing Orange <br />Public Transit and Chapel Hill Transit services – e.g., the increased cost of providing <br />Orange Public Transit and Chapel Hill Transit service that was provided before the <br />transit plan was implemented. About 9,000 existing annual service hours are assisted <br />with Orange County Transit Plan funds. <br /> <br />An anticipated 30,000 – 45,000 additional bus service hours may be available following <br />implementation of D-O LRT. These “rail dividend hours” reflect bus service currently <br />operating in the D-O LRT corridor that could be redirected to meet other Orange County <br />transit priorities. <br /> <br /> Bus Capital Projects <br />The purchase of new vehicles (and subsequent replacement) to support the service <br />funded by the Orange County Transit Plan. <br /> <br />Bus facility improvements to facilitate transit access and improve the customer <br />experience, including new park-and-ride lots, improved transit amenities, and access <br />improvements (e.g. new sidewalks) to bus stops. <br /> <br /> Hillsborough Train Station – 2020 completion date <br />The station will be served by two Amtrak passenger routes. <br /> <br /> North-South Bus Rapid Transit (N-S BRT) – 2023 estimated completion date <br />Bus rapid transit service using a mix of dedicated and mixed-traffic lanes between the <br />Eubanks Road and Southern Village park-and-ride facilities, with direct service to UNC <br />Hospitals. <br /> <br /> Durham-Orange Light Rail Transit (D-O LRT) – 2028 estimated completion date <br />Light rail transit service between UNC Hospitals in Chapel Hill and North Carolina Central <br />University (NCCU) in Durham, providing 50,000 hours of transit service. Project includes <br />bicycle, pedestrian and bus infrastructure improvements along the alignment. <br /> <br /> Durham-Orange Light Rail Transit Extension (D-O LRT) – 2045 est. completion date <br />Light rail transit will be extended from the UNC Hospitals station to a station near Main <br />Street in Carrboro. The route, along S Columbia St and W Cameron Ave, is a conceptual <br />placeholder until further study can be completed. This extension is not in the Orange <br />County Transit Plan. It will be financed in the last decade of the 2045 MTP by assuming <br />that legislative restrictions that currently restrict funding that can be used for transit will <br />be repealed. <br /> <br /> Wake-Durham Commuter Rail Extension (CRT) – 2045 estimated completion date <br />Commuter rail service will be extended from West Durham to Hillsborough, with a <br />station at NC 10/US 70 area and S Churton St/US 70 Business. This extension is not in <br />Page 24 <br />Technical Committee 10/25/2017 Item 5 41
The URL can be used to link to this page
Your browser does not support the video tag.