Browse
Search
Agenda - 11-20-2017 - 6-d - Durham-Chapel Hill-Carrboro Metropolitan Planning Organization 2045 Metropolitan Transportation Plan Preferred Option – Public Comment Period
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 11-20-2017 - Regular Mtg.
>
Agenda - 11-20-2017 - 6-d - Durham-Chapel Hill-Carrboro Metropolitan Planning Organization 2045 Metropolitan Transportation Plan Preferred Option – Public Comment Period
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 4:17:04 PM
Creation date
11/16/2017 3:42:44 PM
Metadata
Fields
Template:
BOCC
Date
11/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Transportation <br /> <br />Summary <br /> <br />As a basis, the 2045 MTP adopts the transit services as approved in the county plans: <br /> Durham County Transit Plan, originally approved in 2011 and updated April 28, 2017. <br />The detailed plan is available at http://ourtransitfuture.com/plans/durham/ <br /> Orange County Transit Plan, originally approved in 2012 and updated April 28, 2017. <br />The detailed plan is available at http://ourtransitfuture.com/plans/orange/ <br /> <br />The plans include major projects such as Durham-Orange Light Rail Transit (D-O LRT) and Wake- <br />Durham Commuter Rail (CRT), but do not include specific programmed bus facility or service <br />projects beyond 2023. The bus services operating in the DCHC MPO in 2045 reflect the MPO’s <br />best predictions of transit services operating at that time. <br /> <br />The 2045 MTP makes two notable transit investments that exceed the county transit plans: <br /> The Wake-Durham Commuter Rail Transit (CRT) is extended from West Durham to <br />Hillsborough in the 2045 timeframe; and, <br /> The Durham-Orange Light Rail Transit (LRT) is extended from Chapel Hill to downtown <br />Carrboro. <br /> <br />Durham County Services <br /> <br />The program of projects and services in the Durham County Transit Plan include the following: <br /> <br /> Bus Services <br />Already Implemented Additional Bus Service (including new routes, increases in <br />frequency, etc.) <br /> GoTriangle, 7,640 annual service hours <br /> GoDurham, 24,350 annual service hours <br /> <br />Planned Additional Bus Service <br /> GoTriangle, 6,260 annual service hours <br /> Durham County Access, 7,896 annual demand responsive trips <br /> <br />The Durham County Transit Plan also supports the increased cost of existing GoDurham <br />service – e.g., the increased cost of providing service that GoDurham provided before <br />the transit plan was implemented. About 9,000 existing annual service hours are <br />assisted with Durham County Transit Plan funds. <br /> <br />An anticipated 15,000 – 27,500 additional bus service hours may be available following <br />implementation of D-O LRT. These “rail dividend hours” reflect bus service currently <br />Page 22 <br />Technical Committee 10/25/2017 Item 5 39
The URL can be used to link to this page
Your browser does not support the video tag.