2045 Metropolitan Transportation Plan (MTP)
<br />Preferred Option -- Highway Project List
<br />Highway Project From To
<br /> Existing
<br />Lanes
<br /> Proposed
<br />Lanes
<br />Improvement
<br />Type
<br /> Length
<br />(miles)
<br /> Estimated
<br />Cost STI
<br />Funding
<br />Source
<br />2035 MTP
<br />Danziger Dr Extension Mt Moriah Rd E Lakewood Dr - 2 New Location 0.4 5,127,000 Div State/Fed
<br />Erwin Rd Cameron Blvd W Main St 4 4 Modernization 1.8 12,025,000 Div Private
<br />Falconbridge Rd Connector Falconbridge Rd Farrington Rd - 2 New Location 0.2 1,227,000 Div State/Fed
<br />Falconbridge Rd Extension Farrington Rd NC 54 - 4 New Location 0.9 16,685,000 Div
<br />State/Fed/
<br />Private
<br />Farrington to I-40 eastbound
<br />slip ramp Farrington Rd I-40 - 1 New Location 0.1 1,600,000 Div State/Fed
<br />Fordham Blvd (US 15-501)NC 54 Franklin Street 4 4 Modernization 2.1 45,498,000 St State/Fed
<br />Fordham Blvd (US 15-501)NC 54 US 15-501 4 4 Modernization 2.2 49,832,000 St State/Fed
<br />Fordham Blvd/Raleigh Rd Interchange - - Upgrade N/A 14,800,000 St State/Fed
<br />Fordham Blvd/S Columbia St Interchange - - Upgrade N/A 35,000,000 St State/Fed
<br />Garrett Rd NC 751 Old Durham Rd 2 4 Widening 2.1 16,064,000 Div State/Fed
<br />Homestead Rd Old NC 86 Rogers Rd 2 2 Modernization 2.1 10,234,000 Div State/Fed
<br />Homestead Rd Rogers Rd NC 86 2 2 Modernization 1.3 6,855,000 Div State/Fed
<br />Hope Valley Rd (NC 751)S Roxboro St Woodcroft Parkway 2 4 Widening 0.3 2,716,000 Reg State/Fed
<br />Hopson Rd Davis Dr S Miami Blvd (NC 54) 2 4 Widening 0.7 5,200,000 Div State/Fed
<br />I-40 NC 86 I-85 4 6 Widening 7.8 58,784,000 St State/Fed
<br />I-40 US 15-501 NC 86 4 6 Widening 3.9 29,316,000 St State/Fed
<br />I-40 Managed Lanes Wake County Line NC 147 8 10 Widening 7.0 446,464,000 St State/Fed
<br />I-40/NC 54 Interchange - - Upgrade N/A 94,100,000 St State/Fed
<br />I-40/ NC 54 ramp Farrington Rd.I-40 - 1 New Location 0.2 1,600,000 St State/Fed
<br />I-85/NC 86 Interchange - - Upgrade N/A 16,488,000 St State/Fed
<br />I-85/S Churton St Interchange - - Upgrade N/A 20,700,000 St State/Fed
<br />Jack Bennet Rd/Lystra Rd US 15-501 South
<br />Farrington Mill/Point
<br />Rd 2 2 Modernization 4.1 20,567,000 Div State/Fed
<br />Lake Hogan Farms Rd Eubanks Rd Legends Way - 2 New Location 0.7 4,407,000 Div
<br />State/Fed/
<br />Private
<br />Marriott Way Friday Center Dr Barbree Chapel Rd - 2 New Location 0.2 682,000 Div State/Fed
<br />NC 54
<br />Fordham Blvd (US 15-
<br />501)Barbee Chapel Rd 6 6 Modernization 1.2 32,106,000 Reg State/Fed
<br />NC 54 I-40 Interchange NC 751 2 4 Widening 1.2 32,000,000 Reg State/Fed
<br />NC 54 NC 751 Rollingwood Dr 2 4 Widening 1.5 21,600,000 Reg State/Fed
<br />STI roadway tier: St = statewide; Reg = regional; Div = division Page 19
<br />Technical Committee 10/25/2017 Item 5 36
|