Orange County NC Website
2045 Metropolitan Transportation Plan (MTP) <br />Preferred Option -- Highway Project List <br />Highway Project From To <br /> Existing <br />Lanes <br /> Proposed <br />Lanes <br />Improvement <br />Type <br /> Length <br />(miles) <br /> Estimated <br />Cost STI <br />Funding <br />Source <br />2035 MTP <br />Danziger Dr Extension Mt Moriah Rd E Lakewood Dr - 2 New Location 0.4 5,127,000 Div State/Fed <br />Erwin Rd Cameron Blvd W Main St 4 4 Modernization 1.8 12,025,000 Div Private <br />Falconbridge Rd Connector Falconbridge Rd Farrington Rd - 2 New Location 0.2 1,227,000 Div State/Fed <br />Falconbridge Rd Extension Farrington Rd NC 54 - 4 New Location 0.9 16,685,000 Div <br />State/Fed/ <br />Private <br />Farrington to I-40 eastbound <br />slip ramp Farrington Rd I-40 - 1 New Location 0.1 1,600,000 Div State/Fed <br />Fordham Blvd (US 15-501)NC 54 Franklin Street 4 4 Modernization 2.1 45,498,000 St State/Fed <br />Fordham Blvd (US 15-501)NC 54 US 15-501 4 4 Modernization 2.2 49,832,000 St State/Fed <br />Fordham Blvd/Raleigh Rd Interchange - - Upgrade N/A 14,800,000 St State/Fed <br />Fordham Blvd/S Columbia St Interchange - - Upgrade N/A 35,000,000 St State/Fed <br />Garrett Rd NC 751 Old Durham Rd 2 4 Widening 2.1 16,064,000 Div State/Fed <br />Homestead Rd Old NC 86 Rogers Rd 2 2 Modernization 2.1 10,234,000 Div State/Fed <br />Homestead Rd Rogers Rd NC 86 2 2 Modernization 1.3 6,855,000 Div State/Fed <br />Hope Valley Rd (NC 751)S Roxboro St Woodcroft Parkway 2 4 Widening 0.3 2,716,000 Reg State/Fed <br />Hopson Rd Davis Dr S Miami Blvd (NC 54) 2 4 Widening 0.7 5,200,000 Div State/Fed <br />I-40 NC 86 I-85 4 6 Widening 7.8 58,784,000 St State/Fed <br />I-40 US 15-501 NC 86 4 6 Widening 3.9 29,316,000 St State/Fed <br />I-40 Managed Lanes Wake County Line NC 147 8 10 Widening 7.0 446,464,000 St State/Fed <br />I-40/NC 54 Interchange - - Upgrade N/A 94,100,000 St State/Fed <br />I-40/ NC 54 ramp Farrington Rd.I-40 - 1 New Location 0.2 1,600,000 St State/Fed <br />I-85/NC 86 Interchange - - Upgrade N/A 16,488,000 St State/Fed <br />I-85/S Churton St Interchange - - Upgrade N/A 20,700,000 St State/Fed <br />Jack Bennet Rd/Lystra Rd US 15-501 South <br />Farrington Mill/Point <br />Rd 2 2 Modernization 4.1 20,567,000 Div State/Fed <br />Lake Hogan Farms Rd Eubanks Rd Legends Way - 2 New Location 0.7 4,407,000 Div <br />State/Fed/ <br />Private <br />Marriott Way Friday Center Dr Barbree Chapel Rd - 2 New Location 0.2 682,000 Div State/Fed <br />NC 54 <br />Fordham Blvd (US 15- <br />501)Barbee Chapel Rd 6 6 Modernization 1.2 32,106,000 Reg State/Fed <br />NC 54 I-40 Interchange NC 751 2 4 Widening 1.2 32,000,000 Reg State/Fed <br />NC 54 NC 751 Rollingwood Dr 2 4 Widening 1.5 21,600,000 Reg State/Fed <br />STI roadway tier: St = statewide; Reg = regional; Div = division Page 19 <br />Technical Committee 10/25/2017 Item 5 36