Orange County NC Website
2045 Metropolitan Transportation Plan (MTP) <br />Preferred Option -- Highway Project List <br />Highway Project From To <br /> Existing <br />Lanes <br /> Proposed <br />Lanes <br />Improvement <br />Type <br /> Length <br />(miles) <br /> Estimated <br />Cost STI <br />Funding <br />Source <br />2025 MTP <br />Brier Creek Pkwy Extension T.W. Alexander Dr Andrew's Chapel Rd - 4 New Location 0.4 3,990,000 Div Private <br />Carver St Ext*Armfield St Old Oxford Rd - 4 New Location 1.0 8,185,000 Div State/Fed <br />East End Connector (EEC)*NC 147 US 70 - 4 New Location 3.6 140,700,000 St State/Fed <br />Eubanks Rd MLK Blvd (NC 86)Millhouse Rd 2 4 Widening 0.8 7,487,000 Div State/Fed <br />Fayetteville Rd Barbee Rd Cornwallis Rd 2 4 Widening 1.0 3,374,000 Div State/Fed <br />Fayetteville Rd Woodcroft Pkwy Barbee Rd 2 4 Widening 1.3 4,661,000 Div State/Fed <br />Fordham Blvd (US 15-501)I-40 Franklin St 4 4 Modernization 1.6 2,052,000 St State/Fed <br />Freeland Memorial Extension S Churton St New Collector Rd - 2 New Location 0.5 3,203,000 Div Private <br />I-40/NC 86 Interchange - - Upgrade N/A 16,500,000 St State/Fed <br />I-40 (westbound auxiliary lane)NC 147 NC 55 6 7 Widening 1.2 3,850,000 St State/Fed <br />Legion Rd Ext Legion Rd Fordham Blvd - 2 New Location 0.1 1,500,000 Div Private <br />Lynn Rd/Pleasant Dr Connector Lynn Rd Pleasant Dr - 2 New Location 0.6 3,651,000 Div Private <br />NC 147 (Operational <br />Improvements)Briggs Ave W Chapel Hill St 4 4 To Be Determined 1.7 58,400,000 St State/Fed <br />NC 147 (possible Managed <br />Lanes)East End Conn I-40 4 8 Widening 4.9 179,248,000 St State/Fed <br />NC 54 Old Fayetteville Rd MPO Boundary 2 3 Widening 2.9 14,457,000 Reg State/Fed <br />NC 55 (Alston Ave)*NC 147 Main St 2 4 Widening 0.4 13,934,000 Reg State/Fed <br />NC 55 (Alston Ave)*Main St NC 98 2 2 Modernization 0.5 17,252,000 Reg State/Fed <br />New Collector Rd Orange Grove Rd Ext Becketts Ridge Rd - 2 New Location 0.8 7,232,000 Div <br />State/Fed/ <br />Private <br />Orange Grove Connector Orange Grove Rd US 70 - 2 New Location 0.4 5,299,000 Div State/Fed <br />Purefoy Rd Ext Sandberg Ln Weaver Dairy Rd - 2 New Location 0.6 3,777,000 Div Private <br />S Elliot Rd Ext Fordham Blvd Ephesus Church Rd - 2 New Location 0.3 4,230,000 Div <br />State/Fed/ <br />Private <br />US 70 (freeway conversion)Pleasant Dr S Miami Blvd 4 6 Freeway 1.6 111,020,000 St State/Fed <br />Woodcroft Pkwy Ext Garrett Rd Hope Valley Rd - 2 New Location 0.2 2,219,000 Div State/Fed <br />US 15-501/Garrett Rd Interchange - - New Interchange N/A 71,200,000 St State/Fed <br />US 70/Miami Bvld Interchange - - New Interchange N/A 46,621,000 St State/Fed <br />STI roadway tier: St = statewide; Reg = regional; Div = division Page 18 <br />Technical Committee 10/25/2017 Item 5 35