Browse
Search
Agenda - 11-14-2017 - D.2 - Unified Development Ordinance (UDO) and Zoning Atlas Amendments – Flood
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 11-14-2017 - QPH
>
Agenda - 11-14-2017 - D.2 - Unified Development Ordinance (UDO) and Zoning Atlas Amendments – Flood
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2017 2:52:30 PM
Creation date
11/14/2017 2:45:57 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2017
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
D.3
Document Relationships
2017-628 Statement of Approval and Consistency Of A Proposed Unified Development Ordinance Text Amendment With the Adopted Orange County 2030 Comprehensive Plan
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-629 Statement of Approval and Consistency Of A ProposedZoning Atlas Amendment with the Adopted Orange County 2030 Comprehensive Plan
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Minutes 11-14-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
ORD-2017-024 Ordinance amending the Zoning Atlas by eliminating the Special Flood Hazard Area (SFHA) Overlay District as currently depicted on the atlas encumbering the identified parcels of property
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2017
ORD-2017-026 Ordinance adopting a new Flood Insurance Study (FIS) and new Flood Insurance Rate Maps (FIRMs) as produced by the State of NC and FEMA
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 10: Definitips <br /> Section 10.1: Definitions <br /> Mean-sea-level <br /> • ee .- . -•*-- a n •• <br /> corrected in 1929, the North American Vertical Datum (NAVD) as corrected in 1988, or other vertical <br /> Mood Elevations shown on a Flood Insurance Rate Map (FIRM) are referenced. Refer to each FIRM <br /> eat Processing Facility, Community <br /> A mailer scale facility where livestock or wildlife is slaughtered, processed, and packaged for pe' onal <br /> con umption and/or wholesale or retail sale. The livestock must be raised on the subject farm . d from 1 <br /> to 4 o er cooperative farm partners. <br /> Meat Pr• cessing Facility, Regional <br /> A larger sca - facility where livestock is slaughtered, processed, and prepared for distr.eution for <br /> wholesale or retail sale. <br /> Metal Fabricat •n Shop <br /> A facility that is enga..'ed in the shaping of metal and similar materials for wholesale or retail sale. <br /> Microbrewery, pro. . ction only <br /> A facility that produces less han 15,000 barrels per year of craft malt b: erages for wholesale or retail <br /> sale and consumption off the a remises. Shall be considered a bona fi•e farming use if located on a farm <br /> and using primarily crops prod .ed on-site. <br /> Microbrewery with Minor E -nts <br /> A facility that produces less than 15,066 barrels per year of c :ft malt beverages for consumption on-or <br /> off-site with limited hours for tours of the acility and tasting- of the products produced on-site, and small <br /> periodic events that are expected to attrac fewer than 150 people to the site. Food services may be <br /> permitted under the conditional zoning or special use p•rmit approval. <br /> Microbrewery with Major Events <br /> A facility that produces less than 15,000 barrels •- ear of craft malt beverages for consumption on-or <br /> off-site with tours of the facility, tastings of the • odu s produced on-site, and periodic events that are <br /> expected to attract more than 150 people to e site. Feed services may be permitted under the <br /> conditional zoning or special use permit approval. <br /> Mobile Home <br /> A dwelling unit that: <br /> a) Is not constructed in accordance with the standards of th- orth Carolina Uniform Residential <br /> Building for One-and T .-Family Dwellings; <br /> b) Is composed of one or ore components, each of which is su.stantially assembled in a <br /> manufacturing plant end designed to be transported to the hom_ site on its own chassis for <br /> placement on a te• porary or semi-permanent foundation when c• nected to the required utilities, <br /> and includes th- •lumbing, heating, air conditioning and electrical s tems contained therein; and <br /> c) Exceeds eigh eet in body width and 32 feet in body length. <br /> d) Is not certifi:: by the Secretary of the Department of Housing and Urba Development. <br /> Mobile home shal also mean a double-wide mobile home. <br /> Mobile Ho r e, Accessory <br /> A subordin- e structure, the use of which is customarily incidental to the permitted use o e principal <br /> buildings. Accessory uses include, but are not limited to: <br /> a) torage unit, <br /> b Office, and <br /> Classroom facility. <br /> T e mobile home, as an accessory structure, must not create non-conforming yards or setbacks. e <br /> nstallation of a mobile home, as an accessory structure, is exempt from the requirements set forth he -in. <br /> Orange County, North Carolina—Unified Development Ordinance Page 10-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.